How long does a retaining wall take?

Published sources do not agree. Angi says a hired crew can build a wall in a couple of days, Homewyse says 2 to 5 days and HomeAdvisor says most walls go up in one to three weeks. HomeGuide and Fixr publish no build time at all. This guide shows each source’s own figure, the order of work, what stretches the schedule and Pennsylvania timing rules instead of averaging them.

Most retaining walls, per HomeAdvisor1–3 weeks
Call (570) 397-9800Get a free estimateRetaining wall cost

What the timeline looks like

SourceStated build timeWhat it applies to
HomeAdvisor1 to 3 weeksA general statement for most retaining walls. No page date shown.
Angi, retaining wall cost guide (updated June 13, 2024)A couple of daysWhen you hire a landscaper. Angi adds that interlocking block has the quickest installation.
Homewyse (dated January 2017)2 to 5 daysRetaining wall installation in general, with no size or material given. The oldest figure here.
Nicolock, block manufacturerA weekend for a small wall; several days or more for larger professional jobsDepends on wall height, materials and complexity. No heights given.
Mr. Handyman (last published July 30, 2025)A weekend, DIYA wall about 12 feet long and 4 feet high.
Redi-Rock, block manufacturer (no date shown)300 to 600 sq ft of wall face per dayMachine-set installation. Depends on block type, site access, equipment, wall complexity and crew experience.
Angi, landscaping timing guide (no date shown)A month or more for the whole landscaping jobLists a retaining wall among bigger projects that can stretch a landscaping job to a month or more. Not a build time for the wall alone.
HomeGuide (no date shown)Not publishedThe guide lists how long construction will take as a question to ask your contractor.
Fixr (updated Jan 31, 2025)Not publishedNo build time or labor hours. It covers permits, engineers and labor rates.

Sources, checked Nov 24, 2026: HomeAdvisor’s retaining wall cost guide; Angi’s retaining wall cost guide and landscaping timing guide; Homewyse’s retaining wall installation page; Nicolock’s retaining wall installation instructions (published July 16, 2024, last modified April 9, 2026 per the page metadata); Mr. Handyman’s retaining wall guide; Redi-Rock’s construction efficiency FAQ; HomeGuide’s and Fixr’s retaining wall cost guides. The sources do not say what wall length or height their numbers assume, which may explain part of the gap. These are general sourced timelines, not a Muthler schedule or promise.

Step by step: the order of work

PhaseWhat happens, per the sourcesTime the sources publish
1. Plan, permit and engineer checkFixr and Angi say a permit is usually needed above 3 to 4 feet. Angi, Fixr, HomeAdvisor and Bob Vila say a wall over 4 feet needs a structural engineer to design it.Not published for walls. HomeAdvisor says permit holdups can stretch the schedule, and Bob Vila says engineering adds design time.
2. Utility markingIn Pennsylvania, homeowners and contractors must call 811 before any digging. Mr. Handyman also advises calling 811 before digging.At least 3 business days (PA Public Utility Commission)
3. Layout and excavationVegetation and organic soil come out. Allan Block’s trench for a wall under 4 feet is 18 inches wide and 4 inches deep plus the buried block. For 4 feet or taller it is 24 inches wide and 6 inches deep plus 1 inch per foot of wall height. Nicolock says to dig 9 to 14 inches deep and 6 inches past the block front and back.Not published
4. Base and leveling padAllan Block says to compact the trench with at least two passes of a plate compactor, add at least 6 inches of wall rock, rake it smooth and compact it again with at least two passes. Nicolock calls for a 6-inch leveling pad.Not published
5. Drain and first courseAllan Block requires a drain pipe on reinforced walls, gravity walls over 4 feet or poorly drained sites, vented to daylight every 50 feet. Nicolock buries the first course 10% of the wall height or at least 6 inches, whichever is greater.Not published
6. Stack, backfill and compactEach course gets wall rock behind it, and soil backfill goes in lifts of 8 inches or less with at least two compaction passes (Allan Block). Nicolock calls for geogrid at 3 feet or more, or where the engineer’s plans require it.Redi-Rock: 300 to 600 sq ft per day, machine-set. Angi: a couple of days.
7. Cap and finish gradeNicolock secures the cap with masonry adhesive. Allan Block backfills the last course with organic soil for plantings.Not published

Sources, checked Nov 24, 2026: Allan Block’s basic installation steps (copyright 2025, no publication date visible); Nicolock; PA Public Utility Commission, PA One Call page (no date shown); Fixr; Angi; HomeAdvisor; Bob Vila (published April 12, 2022, modified July 6, 2022); Mr. Handyman; Redi-Rock. Steps differ by wall system, so follow the manufacturer’s guide and any engineer’s plans. A poured concrete wall adds forming; Fixr says it needs a frame built first and an anchored wall needs a slab poured first. Not published means the sources we read give no time for that phase.

What stretches the schedule

Site and soil
  • Slopes need extra excavation for step-downs or terracing (Angi).
  • Rocky or unstable soil needs extra digging and compaction (Angi).
  • Land clearing, grading and tree removal add time (Angi).
  • Replacing an old wall or adding drainage means demolition and more excavation (Fixr, Angi).
Wall type and size
  • Hand-stacked limestone and I-beam walls take longer than interlocking block (Angi).
  • Patterns of different-sized blocks take longer than uniform blocks, and height, layout complexity and material also lengthen the job (Mr. Handyman).
  • Poured concrete needs a frame built first (Fixr).
Process and weather
  • Bad weather, complicated terrain or permit holdups can stretch the schedule (HomeAdvisor).
  • Bob Vila says an engineered design takes more time and effort to design and build.
  • Frozen ground makes digging more difficult (Angi).
  • Site access, equipment availability and crew experience change the daily rate (Redi-Rock).

What shortens it

Choose the system
  • Interlocking block is the quickest to install (Angi, Bob Vila).
  • Redi-Rock says its blocks enable faster construction with smaller crews and fewer steps than cast-in-place concrete or gabion walls.
  • Fixr says dry-stacked stone is quicker than wet-laid stone, and shotcrete goes on much quicker than cast-in-place concrete.
Keep it simple
  • Uniform blocks go faster than patterns of mixed sizes (Mr. Handyman).
  • Angi says keeping a wall under 4 feet avoids the engineer fee and the added supports and footings. It frames that as a cost point, not a schedule claim.
Schedule it well
  • Angi suggests scheduling when the ground is still soft and avoiding winter, framed as a way to save money.
  • Angi’s landscaping guide says spring and fall are usually the best seasons, but they are busy, so you may wait for a contractor.
  • Redi-Rock lists site access and equipment availability among the factors that set the daily rate, so ask what machines will be on site.

Pennsylvania timing: season, frost, permits and 811

TopicWhat the sources say
811The PA Public Utility Commission says homeowners and contractors must call at least three business days before any digging or excavation project. Ask who places the call, because the dig date waits on the marks. See our 811 dig law guide.
Season and frozen groundAngi says you can build a wall at any time of year, but digging into frozen ground is more difficult, and it suggests scheduling when the ground is still soft. See our guide to digging in frozen ground.
Frost depthPenn State’s Pennsylvania Housing Research Center publishes freeze-depth maps, written for manufactured housing foundations, whose labels run from about 24 to 54 inches across the state. It says local municipal requirements should be followed, so ask your township what footing depth it requires.
Concrete in cold weatherThe Pennsylvania Aggregates and Concrete Association says not to place concrete on frozen subgrades and that set times at 30 degrees F can be twice as long as at 50 degrees F. That matters for a poured wall or a concrete footing.
PermitsPennsylvania’s residential permit rule, 34 Pa. Code 403.62(c), lists retaining walls not over 4 feet, measured from the lowest adjacent grade to the top of the wall, among work that needs no state UCC permit unless the wall supports a surcharge, and only if the work does not violate a law or ordinance. Fixr, Angi and Bob Vila put the usual permit trigger at 3 to 4 feet, so your township may be stricter. Confirm with your local code office. See our UCC permit exemptions guide.
Code editionJensenHughes’ code alert says Pennsylvania adopted the 2021 International Codes, with amendments, effective Jan. 1, 2026, and the PA Department of Labor & Industry lists the triennial update’s effective date as Jan. 1, 2026. Confirm with your local code office which edition and local rules apply to your wall.
Contractor rulesThe PA Attorney General’s Home Improvement Consumer Protection Act page says contractors doing $5,000 or more of home improvements in a calendar year must register, the registration number must appear in contracts, estimates, proposals and ads, and a contract for more than $500 must be written and signed. See Pennsylvania contractor license rules.

Sources, checked Nov 24, 2026: PA Public Utility Commission, PA One Call (no date shown); Angi; Penn State PHRC, Soil Freeze Depth Guide for Manufactured Housing in PA, 2nd ed., April 2014 (the map labels were read from a text extraction, so confirm against the maps); Pennsylvania Aggregates and Concrete Association, 6 Tips for Placing Concrete in Cold Weather (no date shown); 34 Pa. Code 403.62 as published by Justia, current through Register Vol. 54, No. 38, Sept. 21, 2024, which says it may not be the most recent text; Fixr; Bob Vila; PA Department of Labor & Industry UCC page (update approved Oct. 16, 2025, effective Jan. 1, 2026); JensenHughes code alert, Dec. 3, 2025; PA Attorney General, Home Improvement Consumer Protection Act FAQ page (no date shown).

Curing and use-ready times

ItemPublished waitSource
Block wall after the last course and capNot published. The instructions list no waiting or curing period.Allan Block; Nicolock
Cap adhesiveNot published. Nicolock names masonry adhesive but gives no cure time.Nicolock
Soil backfillNot a separate wait. It goes in lifts of 8 inches or less as the wall rises.Allan Block
Poured concrete wall or footingNot published in the retaining wall guides we read.None

For poured concrete, use our concrete cure calculator and the driveway installation timeline, which compares slab cure figures from Angi, Concrete Network and HomeGuide. Ask your contractor which product and temperature range they plan around.

Questions to ask a contractor about schedule

Start and duration
  • How long will this construction take, and what wall length and height does that assume? (HomeGuide lists the first part as a question to ask.)
  • When can you start, and what happens to the date if it rains?
Permits and engineer
  • Will you pull the permits and manage site inspections? (HomeGuide)
  • Does the wall need an engineer, and how long does the design take?
Site and weather
  • Who calls 811, and on what date?
  • Will the ground be frozen or saturated by the start date, and what is the plan if it is?

Compare other timelines and cost guides

A wall is often part of a bigger yard plan. See the timelines for a deck, a fence and a driveway, and our existing article on how long a paver patio takes. For money, see the retaining wall cost guide. Grade changes and water often come first, so see yard grading cost, French drain cost and excavation cost. For wall choices, see block vs poured concrete, how to step a retaining wall base on a slope and a fence on top of a retaining wall.

Questions

How long does it take to build a retaining wall?

The sources disagree. Angi says it could take a couple of days when you hire a landscaper, Homewyse says 2 to 5 days (January 2017), and HomeAdvisor says most retaining walls go up in one to three weeks. HomeGuide and Fixr publish no build time.

How long does a small DIY retaining wall take?

Mr. Handyman says a wall about 12 feet long and 4 feet high may be doable over a weekend, and Nicolock says a small wall can be completed over a weekend. Mr. Handyman notes that wall blocks weigh 20 to 80 pounds.

How many square feet of wall can a crew build in a day?

Only one source we read publishes a rate. Redi-Rock says crews can typically install 300 to 600 square feet of its wall per day with machine-set installation, depending on block type, access, equipment, complexity and crew experience.

Do retaining walls need curing time?

The Allan Block and Nicolock instructions we read list no waiting or curing period for block walls. No retaining wall guide we read publishes a cure time for poured concrete walls or footings, so ask your contractor.

How tall can a retaining wall be before it needs an engineer or a permit?

Angi, Fixr, HomeAdvisor and Bob Vila say walls over 4 feet need a structural engineer. Fixr, Angi and Bob Vila say a permit is usually needed above 3 to 4 feet. Pennsylvania’s 34 Pa. Code 403.62(c) lists walls not over 4 feet, unless they support a surcharge, among work that needs no state UCC permit. Confirm with your local code office.

Can you build a retaining wall in winter in Pennsylvania?

Angi says you can build a wall at any time of year, but frozen ground makes digging more difficult and it suggests scheduling when the ground is soft. The Pennsylvania Aggregates and Concrete Association says not to place concrete on frozen subgrades.

How far ahead do I call 811 in Pennsylvania?

The PA Public Utility Commission says homeowners and contractors must call at least three business days before any digging or excavation project.

General sourced timelines only, not a Muthler schedule, quote or promise. Actual timelines depend on your site, wall type, weather, permits and contractor. Sources, checked Nov 24, 2026: HomeAdvisor; Angi (cost guide updated June 13, 2024; timing guide no date shown); Homewyse (January 2017); Nicolock; Mr. Handyman (July 30, 2025); Redi-Rock; Allan Block; HomeGuide; Fixr (updated Jan 31, 2025); Bob Vila (April 12, 2022); Penn State PHRC Soil Freeze Depth Guide (April 2014); Pennsylvania Aggregates and Concrete Association; 34 Pa. Code 403.62 (Justia copy); PA Department of Labor & Industry; PA Public Utility Commission; PA Attorney General. Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.