Sheet Flow: Limits and Roughness Values in the PA DEP Manual

Sheet flow is runoff moving across the ground as a shallow, spread-out layer instead of in a channel. In stormwater calculations it is the first stretch of the flow path, before water gathers into shallow concentrated flow and then channel flow. Pennsylvania’s erosion and sediment control manual limits how long that first stretch can be assumed to run, and it gives roughness values for different ground covers.

Sheet flow and the terms around it

  • Sheet flow: the PA DEP manual does not give a stand-alone definition. It describes sheet flow by how it is used in the time of concentration calculation and by contrast with shallow concentrated flow.
  • Shallow concentrated flow: according to the manual, the part of the flow path that is neither channelized nor sheet flow. Its velocity is read from a nomograph based on slope and watercourse type.
  • Channel flow: flow in a defined channel, with velocities computed using Manning’s equation and full-bank conditions.
  • Time of concentration (Tc): the travel time along the flow path, found by adding the sheet, shallow concentrated and channel flow times.
  • Level spreader: an outlet built to release runoff as sheet flow. See level spreader.

Why it matters on a job

Stormwater calculations in the DEP manual estimate how long runoff takes to reach a point, called the time of concentration, and the first stretch of that estimate is sheet flow. The manual caps the sheet flow length that can be assumed, and it keeps newly graded fills and cut slopes out of the sheet flow equation. Those caps and exclusions are what the rest of this page lays out. Knowing the term also helps in reading plan notes, since a level spreader, for example, is described by the manual as releasing runoff as sheet flow.

The same manual lists related practices that deal with runoff in different forms, among them the silt fence and the vegetated swale. The contour lines on a grading plan show how the ground falls, which is the starting point for tracing a flow path.

What the PA DEP manual sets

The PA DEP Erosion and Sediment Pollution Control Program Manual, document 363-2134-008 (effective April 15, 2000 in the copy cited below), says the following on pages 5 and 9:

  • Maximum length for unpaved areas: because of the irregular topography, the maximum sheet flow length used for unpaved areas in Pennsylvania is 150 feet. The manual says the most likely maximum is 50 to 100 feet.
  • Theoretical maximum: 300 feet is called a theoretical maximum that applies only in unusual cases, such as uniformly sloped paved parking lots.
  • Disturbed areas: the maximum flow path length for any disturbed area is 50 feet.
  • Fills and cuts: the sheet flow equation is not used for newly graded fills or cut slopes. Runoff from those areas is treated as shallow concentrated flow.
  • Paved areas: for very smooth, uniform paved areas, sheet flow travel time can be calculated up to a maximum of 150 feet.

The sheet flow equation takes the flow path length in feet, the surface slope in feet per foot, and a roughness coefficient from the manual’s Table 3. The values in that table are:

  • Smooth pavement: 0.02
  • Bare packed soil: 0.1
  • Poor grass cover: 0.3
  • Average grass cover: 0.4
  • Dense grass or thick brush: 0.8

A higher roughness number means the ground slows the water more. The manual also notes that its own worked example on page 12 uses 100 feet of sheet flow, which is longer than the 50-foot disturbed-area limit, though the example’s watershed is not described as a disturbed area. That is a reminder to read the limits in context. Verify against the current manual and the approved plan.

Reading a site plan with sheet flow in mind

These equations normally appear in the engineer’s calculations behind a stormwater or erosion plan, not on a quote. What the manual’s rules show is how it treats disturbed ground: the flow path cap for any disturbed area is only 50 feet, and newly graded fills and cut slopes are treated as shallow concentrated flow instead of sheet flow. The erosion and sediment control plan is where a project’s erosion measures are documented, and post-construction design belongs in the PCSM plan.

Sheet flow FAQ

How long can sheet flow be assumed to run in Pennsylvania?

The PA DEP manual says the maximum sheet flow length for unpaved areas is 150 feet, with 50 to 100 feet the most likely maximum, and 50 feet for any disturbed area.

Does sheet flow apply to new fills and cut slopes?

No. The manual says the sheet flow equation is not used for newly graded fills or cut slopes, and runoff from them is treated as shallow concentrated flow.

What roughness value is used for grass?

Table 3 in the manual lists 0.3 for poor grass cover, 0.4 for average grass cover and 0.8 for dense grass or thick brush. Bare packed soil is 0.1.

What comes after sheet flow in the flow path?

Shallow concentrated flow and then channel flow. The manual adds the three travel times to get the total time of concentration.