Subcontractor scope · central PA

Stormwater BMP installation

When the plans call for a basin, swale or rain garden, we excavate, build and stabilize it to the drawing. We install what the engineer designed. We do not design stormwater systems.

Call (570) 397-9800How we bid

What a stormwater bid covers

ItemWhat we price
Excavation and gradingBottom and side slopes to the plan elevations
Stone and drainage layersSpecified stone, geotextile and underdrain where in our scope
Berms and outletsEmbankments and outlet structures as drawn, where in our scope
StabilizationTopsoil, seed and matting, or planting if in our scope

A key rule on infiltration BMPs: keep sediment-laden runoff and heavy equipment off the bed. We sequence the work with the erosion controls so the bed is built late. Surveying, as-built drawings, testing and engineer inspections are excluded unless stated.

What we need to price it

Plan sheets
  • Stormwater details and sections
  • Outlet and pipe schedule
Materials
  • Stone gradation and soil media spec
  • Plant list if planting is ours
Sequence
  • When the bed may be opened
  • Inspection hold points

General background: building infiltration practices without ruining them

This section is general education from public sources. It is not a statement about a specific project.

PennDOT’s Local Technical Assistance Program (LTAP) publishes guidance on common construction mistakes with green stormwater infrastructure. It says infiltration bed bottoms should not be compacted except where infiltration is not recommended or possible, that heavy equipment should be kept out of these areas, and that the zones should be clearly marked. It also says to store stone off bare soil and protect it from sediment-laden runoff, and to keep silt and clay out of the soil mix, since fine particles clog infiltration zones.

Materials get the same scrutiny. LTAP recommends specifying clean-washed stone with a high void ratio and inspecting each delivery for dust and fine particles. If stone arrives dirty, it should be rejected or washed on site. Vegetation should be installed only after soil and grading work is complete. These points explain why bid documents often set hold points and an order of work for stormwater features.

General background: Pennsylvania erosion control rules that touch stormwater work

Under 25 Pa. Code § 102.4, a project’s erosion and sediment plan must sequence the installation and removal of controls with the earth disturbance, and the plan must aim to minimize soil compaction. Controls are inspected weekly and after each stormwater event, with a written report, and the plan and inspection reports are kept on site.

Digging a basin also falls under OSHA’s excavation standard. Protection from cave-ins is required unless the excavation is in stable rock or is less than 5 feet deep with a competent person finding no potential for a cave-in (29 CFR 1926.652). The Public Utility Commission says contractors must call 811 at least three business days before any digging.

Sources: PennDOT LTAP Technical Information Sheet #240 on green stormwater infrastructure construction pitfalls (gis.penndot.pa.gov); 25 Pa. Code § 102.4 (law.cornell.edu); OSHA 29 CFR 1926.652 (osha.gov); Pennsylvania Public Utility Commission, PA One Call page (puc.pa.gov). Checked Nov 23, 2026. General information, not engineering advice. Follow the stormwater plan and permit.

Questions

Do you design the BMP?

No. We build to the design supplied by the project engineer.

Can you handle the erosion controls around it?

Yes, when in our scope. See erosion and sediment control.

Why is an infiltration bed usually built late in the sequence?

PennDOT LTAP guidance says to keep infiltration areas uncompacted, keep heavy equipment out and protect them from sediment, because fine particles clog infiltration zones.