Subcontractor scope · central PA

Erosion and sediment control

We install and maintain the controls shown on the project’s erosion and sediment control plan: silt fence, inlet protection, rock construction entrances and temporary stabilization. The plan itself comes from the project engineer.

Call (570) 397-9800How we bid

What the rules say

TriggerRequirement
5,000 sq ft or more of earth disturbanceA written E&S plan prepared by a person trained and experienced in E&S control, kept at the site and available to DEP or the conservation district (25 Pa. Code § 102.4)
1 acre or more of earth disturbanceNPDES permit coverage for construction stormwater generally applies (PA DEP)

Sources: 25 Pa. Code § 102.4 (law.cornell.edu/regulations/pennsylvania/25-Pa-Code-SS-102-4) and PA DEP’s Construction Stormwater page (pa.gov, DEP Bureau of Clean Water), checked Nov 22, 2026. The project’s engineer and permit holder decide what applies to a given job.

What an erosion control bid covers

Install
  • Silt fence and compost socks
  • Inlet protection
  • Rock construction entrance
Maintain
  • Repairs after storms
  • Sediment cleanout per the plan
Stabilize
  • Temporary seeding and mulch
  • Removal when the site is stable

General background: what Chapter 102 asks of the controls

This section is general education from public sources. It is not a statement about a specific project.

Chapter 102 of the Pennsylvania Code goes further than the table above. Under 25 Pa. Code § 102.4, best management practices are required even for earth disturbance under 5,000 square feet. A written plan is also required where another DEP regulation calls for one, or where the disturbance could discharge to a High Quality or Exceptional Value water. The plan must be prepared by a person trained and experienced in E&S methods suited to the project’s size and scope.

The rule also shapes the day-to-day work. Controls must be inspected weekly and after each stormwater event, and each inspection must be documented in a written report. The plan, inspection reports and monitoring records must be kept on site for review during all stages. The plan must sequence the installation and removal of controls with the earth disturbance, repairs or replacement of controls must be part of the program, and the plan must aim to minimize the extent and duration of earth disturbance, protect existing drainage features and vegetation, and minimize soil compaction.

General background: keeping sediment off stone and bare ground

PennDOT’s Local Technical Assistance Program advises storing stone off bare soil and protecting it from sediment-laden runoff, and keeping silt and clay out of soil mixes because fine particles clog infiltration zones.

General background: diverting water around a dig

OSHA’s excavation standard (29 CFR 1926.651(h)) says that if an excavation interrupts natural surface drainage, diversion ditches, dikes or other suitable means must be used to keep surface water out of the excavation. The same rule requires a competent person to monitor any water removal equipment.

Sources: 25 Pa. Code § 102.4 (law.cornell.edu); PennDOT LTAP Technical Information Sheet #240 (gis.penndot.pa.gov); OSHA 29 CFR 1926.651 (osha.gov). Checked Nov 23, 2026. General information, not legal or engineering advice.

Questions

Do you write E&S plans?

No. We install and maintain the controls on the plan the project engineer prepares.

When is a written E&S plan required in PA?

For earth disturbance of 5,000 square feet or more, under 25 Pa. Code § 102.4. NPDES permit coverage generally applies at one acre or more.

How often must erosion controls be inspected in PA?

Section 102.4 calls for inspection weekly and after each stormwater event, with a written report for each inspection.

Are controls required on small disturbances?

Yes. Section 102.4 requires best management practices even for earth disturbance under 5,000 square feet, though a written plan is triggered at 5,000 square feet.