Foundation excavation subcontractor

We excavate for footings, foundation walls and basements, then backfill after the foundation trade is done. Dig size, depth and spoil handling are priced from the foundation plan and the site plan together.

Call (570) 397-9800How we bid

What a foundation excavation bid covers

ItemWhat we price
Footing excavationTrenches to the footing depth and width on the plan
Basement or pit excavationBulk dig with working room and sloped sides as the safety plan requires
SpoilStockpile for backfill and haul-off of the surplus
BackfillCompacted backfill against foundation walls after the wall is braced or cured

Over-dig for working room and OSHA sloping adds quantity beyond the building footprint, so we ask for the geotechnical report and the foundation plan before pricing. Rock, groundwater and unsuitable soil are carried as unit prices or allowances.

What we need to price it

Foundation plan
  • Footing and wall depths
  • Elevations to finished grade
Site
  • Room to stockpile and slope
  • Neighboring structures and utilities
Soils
  • Geotechnical report
  • Groundwater and rock notes

General background: why the dig is bigger than the building

This section is general education from public sources. It is not a statement about a specific project.

OSHA’s excavation standard (29 CFR 1926.652) requires cave-in protection for every employee in an excavation, except in stable rock or in excavations less than 5 feet deep where a competent person finds no potential for a cave-in. One option is to slope the sides no steeper than 1.5 horizontal to 1 vertical, about 34 degrees. As simple arithmetic, that slope adds 1.5 feet of horizontal run for every foot of depth, so an 8-foot-deep dig adds 12 feet per side at the top before any working room is added. Other options use OSHA’s appendices, tabulated data with an engineer’s name on it, or a registered professional engineer’s written design. That is why the foundation plan, the soil report and the site plan are read together.

General background: spoil, water and inspection

Excavated material and equipment must be kept at least 2 feet from the edge of an excavation, or retaining devices must stop material from falling in (1926.651(j)). Workers may not work in an excavation with accumulated or accumulating water unless precautions are taken, such as special protective systems, water removal or a safety harness and lifeline, and a competent person must monitor any water removal equipment. A competent person must inspect the excavation daily, before work starts, and after every rainstorm or other hazard-increasing event. If excavation interrupts natural surface drainage, diversion ditches, dikes or other suitable means must keep water out.

General background: utility locates and unknown quantities

Estimated underground utility locations must be determined before the excavation opens. In Pennsylvania, the Public Utility Commission says contractors must call 811 at least three business days before starting any digging. For unknown quantities such as rock, AIA’s contract guidance describes unit prices as a per-unit cost, so payment follows the quantity actually encountered and installed.

Sources: OSHA 29 CFR 1926.651 and 1926.652 (osha.gov); Pennsylvania Public Utility Commission, PA One Call page (puc.pa.gov); AIA Contracts, “What are unit price items in construction contracts” (learn.aiacontracts.com). Checked Nov 23, 2026. General information, not engineering or legal advice.

Questions

Do you do backfill after the foundation is poured?

Yes. We backfill and compact once the foundation trade releases the walls, as the spec requires.

Do you pour the footings?

Concrete flatwork is a scope we bid. Footing and foundation concrete is only in our proposal if we list it. See concrete flatwork.

Why does the excavation extend beyond the footprint of the building?

Cave-in protection rules such as OSHA’s 1.5 to 1 sloping option, plus room to work, push the top of the dig outward as it gets deeper.