Home / Commercial / Concrete flatwork
Subcontractor scope · central PA
Concrete flatwork subcontractor
We form, place and finish site concrete for general contractors: sidewalks, pads and slabs. Our crew handles the prep and the pour, and we price from the specified thickness, strength and reinforcement.
Call (570) 397-9800How we bidWhat a flatwork bid covers
| Item | What we price |
|---|---|
| Subgrade and base | Compacted stone base to the plan depth |
| Forms and reinforcement | Forming, joints, rebar or mesh as specified |
| Placing and finishing | Ready-mix placement, finish and curing |
| Pads and slabs | Equipment pads, dumpster pads and similar site slabs |
Concrete testing, special inspection, ADA slope verification by a surveyor, and winter protection beyond a stated allowance are listed as exclusions or allowances in the proposal. For homeowner concrete pricing see our concrete driveway cost guide.
What we need to price it
- Thickness, PSI, air entrainment
- Reinforcement and joint layout
- Plan areas and details
- Curb and ramp details
- Pour dates and season
- Truck access
General background: cold weather and fresh concrete
This section is general education from public sources. It is not a statement about a specific project or about how any one contractor works.
Central Pennsylvania pours often run into cold weather. A USDA NRCS engineering fact sheet defines cold weather as a period of more than 3 consecutive days in which the average daily air temperature is below 40°F and the air temperature does not rise above 50°F for more than 12 hours on any of those days. It lists a minimum concrete temperature of 55°F as placed and maintained, and a mixed temperature of 60°F when the air is above 30°F or 65°F when the air is between 0°F and 30°F.
The same sheet says concrete that reaches at least 500 psi compressive strength will not be damaged by one freezing cycle. For protection periods, it gives 2 days for unloaded, unexposed concrete made with Type I or II cement, 3 days for unloaded concrete that is exposed, and 6 days for partially loaded concrete that is exposed. With Type III cement or an extra 100 pounds of cement per cubic yard, those periods drop to 1, 2 and 4 days. Concrete is not placed on frozen subgrade, a frozen subgrade can sometimes be thawed by covering it with insulation for a few days, and snow, ice and frost must be removed before placing.
General background: silica dust when cutting or breaking concrete
OSHA’s respirable crystalline silica standard for construction applies to saw cutting, drilling, jackhammering and similar work on concrete. Employers can follow the control methods in the standard’s Table 1 instead of measuring workers’ exposure, and OSHA notes that applying water to a saw blade substantially reduces dust. Every covered employer must have a written exposure control plan and designate a competent person to implement it.
Sources: USDA NRCS Pennsylvania, “Cold Weather Concreting” engineering fact sheet (nrcs.usda.gov); OSHA, Respirable Crystalline Silica in Construction (osha.gov/silica-crystalline/construction). Checked Nov 23, 2026. General information, not engineering advice. Follow your project specification.
Questions
Do you pour in cold weather?
It depends on the forecast and the spec. We ask for winter protection to be a stated allowance so it is not a surprise to either side.
Do you also do the base prep?
Yes. We prepare the subgrade and stone base ourselves.
What counts as cold weather for concrete?
A USDA NRCS fact sheet defines it as more than 3 consecutive days with an average daily air temperature below 40°F, where the air does not rise above 50°F for more than 12 hours on any of those days.
Related: Parking lot and curb prep · Retaining wall subcontractor · All commercial pages