Daily Field Log
Project: [Project name] · [Property address]
Log by: [Name]

1. Date, weather and crew

Date: [Date] · Day of week: [Day] · Start: [time] · Finish: [time]

Weather: [sky, temperature range, wind] · Rain/ground: [dry / wet / frozen / mud] · Weather stopped work? [no / yes, hours lost]

Crew member / subRoleHoursTask
[Name][Foreman][0.0][e.g. base excavation]
[Name][Laborer][0.0][task]
[Name][Operator][0.0][task]

2. Equipment on site

EquipmentHours runNotes (down, repaired, rented)
[e.g. mini excavator][0.0][notes]
[e.g. plate compactor][0.0][notes]

3. Work completed and quantities installed

Work completed today: [e.g. excavated and compacted base for patio, sections A and B]

ItemTodayTotal to dateContract qty
[e.g. base stone, tons][0][0][0]
[e.g. pavers, sq ft][0][0][0]
[e.g. wall block, face sq ft][0][0][0]

Log quantities and locations, not adjectives. “Compacted 4 in. lifts, 18 x 22 ft, plate compactor, 3 passes per lift” beats “base done.”

4. Deliveries, visitors and inspections

Deliveries (what, supplier, time, quantity, ticket #): [e.g. 12 tons 2A crusher run, ticket 4471, 8:10 am]

Visitors (owner, inspector, utility, supplier rep): [name, who they are, time, what was said or decided]

Inspections or permits: [type, result, inspector name, or none]

5. Delays, changes and safety

Delays (cause, hours lost): [e.g. rain 10 am to noon, 2 hrs, 3 workers]

Owner requests or site conditions that change the scope: [describe; change order needed? yes / no]

Safety: toolbox talk topic [topic or none] · Incidents or near misses [none / describe] · Utility locates in place [yes / n/a]

6. Photos, problems and next-day plan

Photos taken (count, what, where saved): [e.g. 14 photos, base depth and compaction, folder “2026-11-22”]

Problems and questions for the owner, designer or supplier (RFIs): [question, who it was sent to, date]

Next-day plan (crew, equipment, materials needed): [e.g. 4 crew, set pavers sections A and B, need 2 pallets and bedding sand]

Foreman / log author signature · Date
Reviewed by (office or owner) · Date

Fill in a daily log on this page

Type into the boxes, then press Copy. Nothing is saved or sent from this page, so paste the log into your notes, email, job software or a text to the office before you close the tab.

Copied. Paste it where you keep your job records.

Why daily logs win disputes

Most contractor disputes come down to what happened and when: who was on site, what the weather did, what the owner asked for, what was delivered, what was installed. A log written the same day, by the person who was there, with times, quantities and names, is hard to argue with from memory three months later. It is also the easiest way to back up a change order, a weather delay or a request for more time.

What a good log does for you

  • Backs up a change order. If the owner asked for extra work on site, the log shows the date, the request and who was present, which supports the written change order. See our change order form template.
  • Explains delays. Rain, frozen ground, late deliveries and owner decisions all cost days. A log with hours lost and the cause explains the schedule.
  • Proves the work was done right. Base depth, compaction passes, inspection visits and photo counts show the work was done to the plan before it was buried.
  • Makes billing and job costing honest. Crew and equipment hours in the log are the numbers you compare with your estimate.

Habits that make logs useful

  • Fill it in before the crew leaves site, not that night.
  • One log per day per job, even on days with little progress.
  • Facts only: times, quantities, names, what was said. Leave out opinions about the owner.
  • Never go back and change an entry. Add a dated correction instead.
  • Save the photos in a folder named with the date and job, and note the count in the log.

Whether a log is accepted as evidence in a particular dispute is a question for your attorney. This page is a practice guide, not legal advice. For the unpaid-balance side of a dispute, see Pennsylvania mechanics lien deadlines and mechanics lien deadlines by state.

Using the log on a hardscape or landscape job

Log the numbers you priced: base depth and tons, pavers and wall block in square feet, drain pipe in linear feet, joint sand bags. Compare them with your takeoff from how to estimate a paver patio and the paver calculator. The gravel compaction calculator helps check lift thickness and tons against what was delivered. Your drawings come first; if you outsource them, we draw plans for contractors under your logo.

More free templates

This log is part of our free contractor templates. Also see the change order form template, the punch list template for closeout, and the landscape and hardscape proposal template that starts the job.

Questions

What should a daily field log include?

The date, weather, who was on site and for how many hours, equipment hours, work completed, quantities installed, deliveries, visitors and inspections, delays, safety notes, photos taken, problems or RFIs, and the plan for the next day.

How long should I keep daily logs?

Keep them at least as long as your warranty and the time period in which a claim could be brought on the job. Ask your attorney and accountant what applies to you.

Does the fill-in version save my log?

No. It runs in your browser and nothing is sent or stored. Press Copy and paste the log into your own records before you close the page.

Who should fill out the log?

The foreman or lead on site, the same day. If several crews work the job, each lead keeps a log and the office reviews them.