Georgia Permits for Decks, Sheds and Retaining Walls

In Georgia, your city or county decides whether a deck, shed or retaining wall needs a permit, because the state’s version of the residential code deletes the chapter where the model permit exemptions live. In the places we checked, attached decks always need a permit; small sheds of 120 square feet or less are exempt in Cobb and Gwinnett counties; and retaining walls need a permit over 30 inches in Cobb County, at 4 feet in DeKalb County and over 4 feet in Alpharetta, or at any height when they hold back a driveway or other surcharge.

Quick answer

  • Who decides: Your city or county; Georgia deleted the IRC’s permit chapter
  • Decks: Attached decks need a permit everywhere we checked; Cobb exempts small, low, detached decks
  • Sheds: 120 sq ft or less exempt in Cobb and Gwinnett; Savannah permits closed-roof structures over 120 sq ft
  • Retaining walls: Permit over 30 in. in Cobb, at 4 ft in DeKalb, over 4 ft in Alpharetta, or any height with a surcharge
  • Footings: Frost lines run 5 in. (Alpharetta, Fayette) to 18 in. (Macon-Bibb); Alpharetta sets a 12 in. minimum footing depth
  • Land disturbance: Work within 200 ft of a creek or other state waters can need an erosion permit even on a small lot

Who decides if you need a permit in Georgia?

Georgia homes follow the 2024 International Residential Code (IRC) with Georgia amendments, but Georgia’s amendments delete Chapter 1 of the IRC and keep it only as a reference for local governments writing their own procedures (DCA amendment packet). Chapter 1 is where the model code lists work that doesn’t need a permit. Cities and counties that enforce the code adopt their own administrative rules, including permits and fees (DCA, administration and enforcement), so the same backyard project can need a permit in one county and not the next. Exempt or not, the work still has to meet the code. See our Georgia building code guide for how that works.

Do you need a permit for a deck in Georgia?

Almost always for an attached deck. Here’s what the departments we checked say:

  • Cobb County: a deck is exempt only if it is 200 sq ft or less, no more than 30 in. above grade at any point, not attached to a dwelling and not serving the required exit door (Cobb FAQ). Attached structures that add to the home’s footprint need an addition permit (Cobb permit types).
  • Gwinnett County: a building permit is needed before any land disturbance or construction of a deck addition. The process includes a scaled location plan reviewed for setbacks, easements, buffers and stormwater, Environmental Health approval if the home is on septic, and footing, electrical rough-in (if any) and final inspections (Gwinnett deck permit sheet, rev. 2012).
  • DeKalb County: decks fall under the residential additions permit, along with porches, room additions and accessory structures (DeKalb additions guide, rev. July 2025).
  • City of Atlanta: the Office of Buildings’ exempt-work list covers repairs, such as non-structural porch or deck repairs and other repairs under $10,000, not new decks (Work Exempt from Permit, under Ordinance 17-O-1307).
  • City of Savannah: “build a porch, deck or patio” is on the city’s list of projects that need a permit, while a concrete patio on grade is on the no-permit list (needs a permit, no permit, both rev. 2021).
  • Alpharetta (Fulton County): deck plans need dimensioned footprints and post details, and decks that affect specimen trees also need a city engineering permit (Alpharetta permitting procedures, rev. 2026).

Georgia’s 2024 amendments also revise the IRC’s deck ledger-to-band-joist details, lag screw placement and lateral load figures in Section R507, so use deck details drawn to the Georgia version.

How deep do deck footings need to be in Georgia?

Shallower than in the North, but not as shallow as the frost numbers suggest. The IRC requires exterior footings to sit below the local frost line and at least 12 in. below undisturbed ground (IRC R403.1.4), and each Georgia jurisdiction sets its own frost line:

PlaceFrost line or footing depthSource
City of Alpharetta5 in. frost line, 12 in. minimum footing depthPermitting procedures (rev. 2026)
Fayette County5 in.Code and design criteria
Rome and Floyd CountyMinimum 12 in.Codes and design criteria
Macon-Bibb County18 in.Design criteria (2018 IRC table)

The 12 in. minimum controls wherever the frost line is shallower. We didn’t find published frost depths for Atlanta, Cobb, Gwinnett, DeKalb, Savannah or Chatham County, so call the department and ask for its Table R301.2 values before you dig.

Do you need a permit for a shed in Georgia?

  • Cobb County: a one-story detached shed is exempt if its floor area is 120 sq ft or less, it sits at least 5 ft from every property line and it is under 35 ft tall. Zoning can add limits, so the county says to call zoning first.
  • Gwinnett County: no permit for storage buildings of 120 sq ft or less, fences of 8 ft or less, or driveway, sidewalk and basketball slabs covering no more than 35% of the front yard (Gwinnett building services).
  • City of Savannah: a new closed-roof accessory structure over 120 sq ft needs a permit; an open-roof pergola under 200 sq ft and under 10 ft tall doesn’t, and neither does a wood or chain-link fence under 7 ft.
  • Chatham County: sheds, workshops, greenhouses and other detached structures go through a storage permit that asks for a site plan, two sets of drawings, health department approval on septic lots and county engineering approval in a flood zone (Chatham storage permit application).
  • DeKalb County: accessory structures need their own permit and can’t be taller than 20 ft or the house, whichever is less.

One state-level break for sheds: Georgia’s Appendix AY lets accessory structures with no habitable space be built with ungraded lumber.

Do you need a permit for a retaining wall in Georgia?

PlacePermit needed whenEngineering
Cobb CountyOver 30 in., measured bottom of footing to top of wall, or supporting a surcharge such as a drivewayA Georgia PE’s sealed design detail and site plan may be required (Cobb FAQ)
DeKalb County4 ft or more from bottom of footing to top, or supporting a surcharge of any heightPE-sealed drawings plus a soils report from a geotechnical engineer (DeKalb checklist, rev. 2018)
City of AlpharettaOver 4 ft, or any height with a structural surchargeWalls over 4 ft engineered by a Georgia-licensed architect or engineer; stacked walls closer than twice the lower wall’s height count together
City of AtlantaShown on new-home permit plansOver 4 ft must be engineer-designed (new construction checklist, rev. 11/24)
City of Savannah“Construct retaining walls” is on the permit-required list; no height givenAsk the city

Measure from the bottom of the footing, not the visible face: a wall showing 2 ft above grade with a buried course and base can already be past Cobb’s 30 in. trigger. Alpharetta also requires safety barriers on walls over 4 ft and a site plan with grades 10 ft above and below the wall.

When does a Georgia project need a land-disturbance permit?

Separate from the building permit, Georgia’s Erosion and Sedimentation Act bars land-disturbing activity without a permit from the local issuing authority (or a notice of intent to the state where the county or city isn’t certified), unless the work is exempt (O.C.G.A. 12-7-7 and 12-7-17). For backyard work, the exemptions that matter:

  • Single-family homes: building one that disturbs less than 1 acre, and isn’t part of a larger common plan of 1 acre or more, is exempt, but the work must still meet the Act’s minimum erosion-control requirements.
  • Projects under 1 acre: exempt, unless they are within 200 ft of the bank of any state waters or part of a larger common plan of 1 acre or more.
  • Stream buffers: no land disturbance within 25 ft of the banks of state waters, or 50 ft along trout streams, without a variance (O.C.G.A. 12-7-6).

So a wall or patio job near a creek can trigger a local land-disturbance permit even on a small lot. Counties fold this into their process: Gwinnett’s deck permit includes an erosion control affidavit, and DeKalb requires an erosion-control inspection before further land disturbance on additions.

Sources

Last checked November 14, 2026.

Common questions

Do I need a permit to build a deck in Georgia?

Usually. Georgia leaves permit rules to cities and counties, and every department we checked requires a permit for an attached deck. Cobb County exempts a deck only if it is 200 square feet or less, no more than 30 inches above grade, detached and not serving the required exit door.

How big can a shed be without a permit in Georgia?

It depends on the county. Cobb and Gwinnett counties exempt storage buildings of 120 square feet or less, and Cobb also requires the shed to be one story and at least 5 feet from property lines. Savannah requires a permit for closed-roof accessory structures over 120 square feet.

How tall can a retaining wall be without a permit in Georgia?

Up to 30 inches in Cobb County and under 4 feet in DeKalb County, measured from the bottom of the footing, and up to 4 feet in Alpharetta. A wall holding back a surcharge such as a driveway needs a permit at any height in those places.

How deep do deck footings need to be in Georgia?

At least 12 inches below undisturbed ground and below the local frost line. Published frost lines include 5 inches in Alpharetta and Fayette County and 18 inches in Macon-Bibb County, so ask your building department for its number.

This is a plain-English summary, not legal advice.

See every Georgia building, digging and contractor rule on our Georgia guide. Related: Georgia building code · Georgia contractor license requirements · Georgia mechanics lien deadlines · IRC rules in plain English.

Groundwork Design Co. · designed by builders

Plans drawn for Georgia’s rules

Groundwork Design Co. draws patios, walls, decks and planting plans to scale for any U.S. home, with the layout, sizes and materials any local contractor can price.

See design plansSee sample plans

Using this guide? Link to it or cite it. It’s free to use with a link back, and we keep it updated against official sources.

Cite as: Muthler Landscaping & Construction, “Georgia Permits for Decks, Sheds and Retaining Walls,” https://muthlerlandscaping.com/state-guides/georgia/building-permits/ (page updated November 14, 2026).