Floodplain development basics in Pennsylvania
If a property sits in a mapped floodplain, even a fence line, fill pile or shed can count as “development.” The federal flood insurance rules and Pennsylvania’s floodplain chapter both start from the same idea: a flood with a 1 percent chance of occurring in any year, called the 100-year flood or base flood.
General information only, not legal or engineering advice. Your municipality’s floodplain ordinance is what you actually apply for permits under. Confirm what applies to your lot with your local floodplain administrator before you build, fill or grade.
Key terms
| Term | What the source says |
|---|---|
| Development (44 CFR 59.1) | Any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures. The federal definition also covers earth-moving, paving, drilling, and storing equipment or materials. |
| Base flood (44 CFR 59.1) | The flood having a one percent chance of being equaled or exceeded in any given year. |
| 100-year flood (25 Pa. Code 106.1) | The highest level of flooding that, on the average, is likely to occur every 100 years, that is, a flood with a 1.0% chance of occurring each year. |
| Flood hazard area (25 Pa. Code 106.1) | The 100-year floodway and that maximum area of land that is likely to be flooded by a 100-year flood, as shown on the floodplain maps approved or promulgated by FEMA. |
| Floodway (25 Pa. Code 106.1) | The channel of the watercourse and portions of the adjoining floodplains reasonably required to carry and discharge the 100-year flood, as shown on FEMA maps and flood insurance studies. Where no map or study defines it, it is assumed, absent evidence to the contrary, to extend from the stream to 50 feet landward from the top of the bank. |
Who regulates it
Federal rules set minimums for communities that take part in the National Flood Insurance Program. Under 44 CFR 60.3(a)(1), such a community must require permits for all proposed construction or other development in the community. Pennsylvania’s Chapter 106 says its purposes include assisting municipalities in qualifying for the National Flood Insurance Program, and providing for and encouraging local administration and management of floodplains (25 Pa. Code 106.2). Pennsylvania’s Flood Plain Management Act (Act 166 of 1978) is the underlying state law. In practice, the first stop is your township or borough floodplain administrator, who applies the local ordinance.
What federal minimum standards say
These are the standards a participating community’s ordinance must meet. Your local rules may be stricter.
- Floodway: 44 CFR 60.3(d)(2) says the regulatory floodway must carry the base flood without increasing the water surface elevation of that flood more than one foot at any point.
- Encroachments in the floodway: 60.3(d)(3) prohibits them unless it has been demonstrated through hydrologic and hydraulic analyses, performed under standard engineering practice, that the encroachment would not result in any increase in flood levels within the community during the base flood discharge.
- Before a floodway is designated: 60.3(c)(10) bars development in the affected zones unless the cumulative effect of the proposed development, combined with all other existing and anticipated development, will not raise the base flood elevation more than one foot at any point.
- Residential structures: 60.3(c)(2) requires the lowest floor, including the basement, of new or substantially improved residential structures in the mapped zones to be elevated to or above the base flood level, unless an exception applies.
The practical takeaway for site work is that fill, walls and grading in a floodway can need an engineer’s flood analysis before a permit is possible. A yard project that looks minor can still be development under these definitions.
How this fits with other permits
Floodplain approval is separate from DEP’s waterway rules. A wall, fill or culvert in or along a watercourse or floodway may also be a water obstruction under Chapter 105. Grading may bring in Chapter 102 erosion and sediment control. Treat each as its own question.
Steps before you start
- Look up your parcel on the FEMA flood map, or ask your municipality whether it is in a mapped flood hazard area or floodway.
- Ask the local floodplain administrator whether your fence, fill, wall, shed or grading counts as development under the local ordinance.
- If a floodway is involved, expect to need a flood analysis from an engineer.
- Get the permit in writing before work starts.
Sources
- 44 CFR 59.1, Definitions (FEMA, National Flood Insurance Program) (checked Nov 23, 2026)
- 44 CFR 60.3, Flood plain management criteria for flood-prone areas
- 25 Pa. Code 106.1, Definitions
- 25 Pa. Code 106.2, Purposes
- Pennsylvania General Assembly, Flood Plain Management Act, Act 166 of 1978
Related
All Pennsylvania site work regulations · Chapter 105 waterways and wetlands · Wetland and stream buffer setbacks by state
FAQ
What is the 100-year flood?
Under 25 Pa. Code 106.1, it is the highest level of flooding that, on the average, is likely to occur every 100 years, a flood with a 1.0% chance of occurring each year. FEMA’s definition of the base flood says one percent chance of being equaled or exceeded in any given year.
Is a fence or a pile of fill “development”?
The federal definition at 44 CFR 59.1 is any man-made change to improved or unimproved real estate, including but not limited to buildings or other structures, and it covers activities such as earth-moving and storing materials. Ask your local floodplain administrator how your ordinance treats a specific project.
How much can development raise flood levels?
44 CFR 60.3(d)(2) refers to a regulatory floodway that carries the base flood without increasing its water surface elevation more than one foot at any point. In the floodway itself, 60.3(d)(3) prohibits encroachments unless analysis shows no increase in flood levels during the base flood discharge.
Who issues a floodplain permit?
Federal rules require participating communities to require permits for all proposed development (44 CFR 60.3(a)(1)), and Pennsylvania’s Chapter 106 encourages local administration of floodplains. Start with your municipality.
General information only. This page does not state or imply that any company complies with these rules, and it is not legal or engineering advice. FEMA, DEP and your municipality control. Sources checked Nov 23, 2026.