LP-gas and temporary heaters on job sites: OSHA 1926.153 and 1926.154
Quick answer: OSHA limits where LP-gas containers and temporary heaters can be used on construction sites. Under 29 CFR 1926.153, LP-gas storage inside buildings is prohibited, and a container used indoors may hold no more than 245 pounds water capacity. Under 1926.154, solid fuel salamanders are prohibited in buildings and on scaffolds.
Where the rules live
LP-gas and temporary heating are both covered in Subpart F of 29 CFR Part 1926. Section 1926.153 covers liquefied petroleum gas, and 1926.154 covers temporary heating devices. Winter work such as pouring footings, framing an addition or finishing an interior pulls both rules into play: a propane heater, a few cylinders and a tarp-enclosed work area. This page covers paragraphs (h) through (o) of 1926.153 and 1926.154.
What LP-gas means
Section 1926.155 defines LP-gas as a material made up predominantly of propane, propylene, butane, butylenes or mixtures of these. In the field that mostly means the cylinders used for portable heaters and torches.
Using containers inside buildings
Under 1926.153(h), portable containers may be used inside buildings only when the operation requires portable use and placing the container outside is impracticable. A container is considered in use when it is connected for use. The rule then sets these conditions.
- Excess flow valves: containers with a water capacity over 2.5 pounds (nominal 1 pound LP-gas) need an excess flow valve, either integral with the container valve or in the outlet connections.
- Regulators and manifolds: regulators must connect directly to container valves or manifolds and be suitable for LP-gas. Manifolds and fittings up to the regulator inlets must be rated for at least 250 psig service pressure.
- Valve protection: valves on containers over 50 pounds water capacity (nominal 20 pounds LP-gas) must be protected from damage in use or storage.
- Piping and hose: aluminum piping or tubing is prohibited. Hose must be rated for at least 250 psig working pressure, and hose and connections must be listed by a nationally recognized testing agency. Hose must be as short as practicable but long enough to meet spacing rules without kinking, straining or heat damage.
- Container location: containers, regulators, manifolds, piping, tubing and hose must be located to minimize exposure to high heat or physical damage. Containers over 2.5 pounds water capacity that are connected for use must stand on a firm, substantially level surface and be secured upright when necessary.
- Size limit: maximum water capacity per container is 245 pounds (nominal 100 pounds LP-gas).
Valves, connectors, regulators, manifolds, piping and tubing may not be used as structural supports for heaters.
Heater safety devices and spacing
Portable heaters, including salamanders, need an approved automatic device that shuts off gas to the main burner, and to the pilot if one is used, in case of flame failure. Heaters rated over 50,000 BTU per hour need either a proved pilot before the main burner ignites or electric ignition. The flame-failure requirement does not apply to heaters under 7,500 BTU per hour input used with containers of 2.5 pounds water capacity or less.
| Item | What 1926.153(h) says |
|---|---|
| Heater to container | At least 6 feet between a heater and any LP-gas container, unless the heater is an integral heater-container unit or is designed to attach to the container or a support in a way that keeps direct or radiant heat off the container |
| Blower and radiant heaters | Not aimed at any LP-gas container within 20 feet |
| Unit to unit | On the same floor in an unpartitioned area, containers for each of two or more heater-container units must be at least 20 feet from the containers of any other unit |
| Manifolded containers | No more than 735 pounds water capacity (nominal 300 pounds LP-gas) total on one floor in an unpartitioned area, with manifolds at least 20 feet apart |
Multiple container systems
Section 1926.153(i) requires valves that allow a container to be replaced without shutting off the gas flow, although an automatic changeover device is not required. Heaters need an approved regulator in the supply line between the cylinder and the heater, and cylinder connectors need an excess flow valve. Regulators and low-pressure relief devices must be rigidly attached or secured, and installed or protected from the weather.
Storing LP-gas
Storage inside buildings is prohibited under 1926.153(j). For storage outside, 1926.153(k) sets minimum distances from the nearest building or group of buildings based on the total quantity stored.
| Quantity stored | Minimum distance |
|---|---|
| 500 pounds or less | 0 feet |
| 501 to 6,000 pounds | 10 feet |
| 6,001 to 10,000 pounds | 20 feet |
| Over 10,000 pounds | 25 feet |
Containers must be in a suitable ventilated enclosure or otherwise protected against tampering. Each storage location needs at least one approved portable fire extinguisher rated no less than 20-B:C, according to 1926.153(l). The rule also says to take precautions where vehicle traffic could damage LP-gas systems, and to mark containers to identify contents where LP-gas and other gases are stored or used in the same area.
Temporary heating devices: 1926.154
Fresh air and ventilation come first. Section 1926.154(a) requires enough fresh air to protect workers’ health and safety, using mechanical ventilation where the natural supply is inadequate. In confined spaces, ventilation must be sufficient for proper combustion, worker health and safety, and limiting temperature rise.
- Clearances to combustibles (Table F-4): a circulating-type room heater needs 12 inches at the sides and rear and 18 inches at the chimney connector. A radiant-type room heater needs 36 inches at the sides and rear and 18 inches at the chimney connector. Heaters listed for smaller clearances may use the listed clearances.
- Floors: heaters not suitable for wood floors must not sit directly on them or on other combustible materials. They must rest on heat-insulating material or at least 1 inch of concrete, or equivalent, extending at least 2 feet beyond the heater in all directions.
- Tarps and canvas: heaters used near tarpaulins, canvas or similar coverings must be at least 10 feet away, and the coverings must be securely fastened.
- Stability: heaters must be set level unless the manufacturer’s markings permit otherwise.
- Solid fuel salamanders: prohibited in buildings and on scaffolds.
- Oil-fired heaters: flammable liquid-fired heaters need a primary safety control that stops fuel flow on flame failure, and barometric or gravity oil feed does not count as a primary control. Barometric or gravity-feed heaters may only use integral tanks.
Common mistakes
- Storing spare LP-gas cylinders inside a building, which the rule prohibits.
- Placing a heater closer than 6 feet to a connected container, or aiming a blower or radiant heater at a container within 20 feet.
- Running a heater under a tarp without the 10-foot distance and secure fastening.
- Using a heater with no flame-failure shutoff, other than the small units the rule excludes.
- Heating an enclosed space without enough fresh air for combustion and worker safety.
When to get professional help
This page covers only part of 1926.153 and 1926.154. Heater sizing, ventilation design and gas piping in an enclosed work area belong with a qualified professional, and fire code questions go to the local fire marshal. A written program should come from a qualified safety professional or OSHA’s consultation resources.
Sources
Sources checked Nov 23, 2026.
Related
Fire protection and extinguishers · Fire prevention and storage · Confined spaces in construction · All PA site work regulations
FAQ
Can LP-gas cylinders be stored inside a building on a construction site?
No. Section 1926.153(j) prohibits storage of LP-gas containers inside buildings.
How far must a heater be from an LP-gas container?
Under 1926.153(h), heaters other than integral heater-container units must be at least 6 feet from any LP-gas container, and blower or radiant heaters may not be aimed at a container within 20 feet.
Are salamander heaters allowed on scaffolds?
Section 1926.154(d) prohibits solid fuel salamanders in buildings and on scaffolds.
How far must a heater be from tarps?
Heaters used near tarpaulins, canvas or similar coverings must be at least 10 feet away, and the coverings must be securely fastened, according to 1926.154(b).
General information only, not legal or safety advice. Employers must follow the current OSHA standard and applicable Pennsylvania rules. Source pages checked Nov 23, 2026.