Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

Guides · Paver patio installation · Step 2

How to compact a paver base

A paver patio is only as stable as the base under it. Compact the subgrade first, then build the base in thin lifts, compacting each one before adding the next.

Quick answer

Belgard: compact the subgrade, then place base in 2 to 4 in. lifts and compact each to at least 98% Standard Proctor. Unilock: 3 in. lifts, at least 3 passes of a reversible plate compactor each. Both want a flat finished base. Checked Nov. 22, 2026.

Steps

1. Subgrade

Compact the subgrade with a vibratory plate compactor and remove soft spots, backfilling them with base material (Belgard p. 13). Belgard calls for 98% Standard Proctor density and a 1 to 2% slope in the drainage direction (p. 7).

2. Lifts

Belgard: 2 to 4 in. lifts, most residential jobs use two or three. Unilock: 3 in. lifts. The Unilock basic guide says layers 2 to 3 in. thick with a gas-powered plate compactor.

3. Compact each lift

Belgard: reversible plate rated at least 7,000 lbf, or a vibratory roller. Unilock: at least 3 passes with a reversible plate (10,000 lb force).

Check before you move on

Flatness

Belgard: the finished base should vary no more than 3/8 in. under a 10 ft straightedge (pp. 6, 13).

Moisture

Belgard says to keep the base lightly dampened while compacting.

Frost

Do not use frozen base material or place base over frozen subgrade (Belgard p. 13).

Next: screed the bedding sand. Before this: excavation depth, which gravel.

Planning figures, not engineering. Numbers come from manufacturer guides for typical residential patios. Driveways, soft soils and structural loads need more. Follow the instructions for the pavers you buy.

Materials and tools

ItemWhat the manufacturers specify
Base materialBelgard: dense-graded aggregate (road base) common to your area. Unilock: 3/4 in. crusher run gravel or 3/4 in. clear stone.
Base thicknessBelgard minimums: 4 in. for sidewalks and patios, 6 in. for residential driveways, 8 in. for parking lots and residential streets. Unilock planning guide: 6 to 8 in. for patios and 10 to 14 in. for driveways.
Plate compactorBelgard: reversible plate of at least 7,000 lbf for the base, or a vibratory roller. Pavers themselves need a plate of at least 5,000 lb (Belgard p. 8), with a roller for slabs over 12 by 12 in.
GeotextileBelgard: nonwoven fabric over the subgrade and up the sides as a separation layer, “as needed.” Unilock’s guide does not call for it under pavers.
Bedding sandAbout 1 in. of coarse concrete sand, never more than 1 1/2 in. (Belgard). Not masonry sand, play sand or stone dust.
Compactor protectionCardboard, thin carpet, luan plywood or a urethane mat so the machine does not scratch the pavers (Belgard p. 8).

The two manufacturers do not agree on thickness. Belgard publishes a 4 in. minimum for patios, while Unilock’s planning guide says 6 to 8 in. Belgard also says excavation should be at least 8 in. below finished grade, and 10 to 12 in. in freeze-thaw climates or where more base is needed. Where the guides differ, the thicker figure is the safer choice, and the guide for the product you install is the one that controls.

Pennsylvania frost and wet soils

Central PA has freeze-thaw cycles every winter, which is the reason the base matters. Belgard says freeze-thaw climates may need excavation of 10 to 12 in. and that concrete pavers offer freeze-thaw durability when properly installed. Do not build base over frozen subgrade or with frozen material, because the base will settle when the frost leaves. If the subgrade is too wet to compact, Belgard says to let it dry or add a few inches of dry base before compacting. Unilock adds that clay soil requires deeper excavation while sandy soil requires less. Plan for the slope too: Belgard sets a 1.5% minimum (3/16 in. per foot) with 2% (1/4 in. per foot) common, and Unilock says every installation should slope away from the house.

Common mistakes

Under-compacted edges

Belgard says to compact thoroughly along edges, in corners and around structures, because those are the places that settle most often.

Wet or frozen base

Belgard: keep the base lightly dampened, but free water on the surface means it is too wet. Let it dry, and never compact frozen material.

Over-excavating

Belgard warns that digging below the planned depth is costly and causes problems later, because disturbed subgrade has to be rebuilt.

Wrong sand

Masonry sand, play sand and stone dust are all ruled out by Belgard for the bedding layer.

Skipping the sweep

Unilock says to sweep the pavers clean before running the compactor, and to walk on the pavers, not on the screeded bed.

Unprotected pavers

Use a compactor pad. Unilock also warns that dry-cutting pavers releases airborne silica, so use a dustless or wet saw and proper protection.

Inspection points before the sand goes down

  • Lay a 10 ft straightedge across the finished base in several directions. Belgard’s tolerance is 3/8 in.
  • Check that the surface slopes at least 1.5% to 2% away from the house and structures.
  • Look for soft or pumping spots under foot or under the plate. Remove and backfill with base material and recompact.
  • Confirm that gaps where bedding sand could migrate are filled with finer material and recompacted (Belgard p. 13).
  • Confirm the base sits below finished paver height by the thickness of the sand bed plus settlement allowance. Belgard’s example for a 2 3/8 in. paver and 1 1/4 in. of sand puts the base about 3 in. below finish.

Planning only, confirm with your local code office, especially if the work involves drainage changes, retaining walls or driveway connections.

When to hire a pro

A small walkway on well-drained soil is a workable do-it-yourself project if you can rent a reversible plate compactor. Hire a crew for driveways, for patios on soft or clay soil, for anything that needs a retaining wall, or for sites that need grading and drainage work. Belgard states that its drawings are illustrative only and are not for construction without a registered professional engineer’s signature, and that structural repairs should be evaluated by an engineer. Pavement design professionals should confirm suitability for the subgrade soils, slope, drainage and traffic loading.

Questions

How thick should each lift of base be?

Belgard says 2 to 4 in., Unilock’s patio guide uses 3 in., and its basic guide says 2 to 3 in.

How many passes with the plate compactor?

Unilock calls for at least 3 passes per lift. Belgard sets a compaction target of 98% Standard Proctor rather than a pass count.

How flat should the base be?

Belgard: no more than 3/8 in. variation under a 10 ft straightedge.

Can I compact a base that is frozen or very wet?

No. Belgard says not to use frozen base material or place base over frozen subgrade, and to let a base with free water on the surface dry before compacting.

Sources: Belgard Technical Resource Guide, pp. 6 to 14, 23; Unilock, How to Build a Patio on Grade; Unilock Basic Tech Guide. Checked Nov. 22-23, 2026.

Muthler Landscaping & Construction · Lock Haven, PA

Want it built right?

We build paver patios and walkways in central Pennsylvania, with the base done to the manufacturer’s spec.

Get a quoteAll guides

Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.