Guides · Paver patio installation · Step 3
How to screed paver bedding sand
The bedding layer is a thin, flat cushion the pavers sit on. Get the sand type and thickness right, screed it once, and keep every foot and wheelbarrow off it.
Screed about 1 in. of washed concrete sand (Belgard: never over 1 1/2 in.) over 1 in. pipes, then pull the pipes and fill the grooves. No mason’s sand, play sand or screenings. Don’t compact or walk on the screeded sand. Checked Nov. 22, 2026.
Steps
Belgard: washed concrete sand, kept moist but not wet. Unilock: sharp coarse sand, or ASTM No. 8 or 9 chip stone over a No. 57 base.
Belgard: at least two 1 in. OD pipes, 6 to 8 ft apart and parallel, then screed across them. Unilock sets the pipes 1/2 in. above finished height for sand (1/4 in. for chip).
Screed to a uniform bed, remove the pipes, fill the voids and smooth them with a trowel (Belgard p. 7). Do not walk on or compact the bed before laying.
Do not use
| Source | Do not use as bedding |
|---|---|
| Belgard | Masonry sand, play sand, screenings, stone dust |
| Unilock | Limestone screenings, mason’s sand, slag |
Thickness: Belgard says screed to a uniform 1 in. nominal bed and never exceed 1 1/2 in. (p. 14). Unilock’s bed is 1 in. Next: start laying pavers. Before: compact the base.
Materials and tools
| Item | Specification from the guides |
|---|---|
| Sand gradation | Belgard (p. 6): the 1 in. bedding layer should conform to ASTM C33, with less than 1% passing the 0.080 mm sieve. |
| Matching bedding to base | Unilock (p. 16): road base gravel (ASTM D 2940) takes sharp coarse sand; a 3/4 in. open-graded base (ASTM No. 57) takes open-graded chip (ASTM No. 8 or 9). Pair the bedding with the base you built. |
| Why not screenings or mason’s sand | Unilock says limestone screenings, mason’s sand and slag do not drain well and can cause ruts. |
| Screed rails | 1 in. OD pipes (Unilock) or six 3/4 in. ID steel rails or 1 in. square tubing about 10 ft long (Belgard tool list). |
| Screed tool | Straight board, aluminum bar or wide-screed rake (Unilock calls the wide-screed rake the easiest and most efficient). Belgard lists a magnesium screed board or 10 to 12 ft 2x4s. |
| Finishing tools | Rectangular mason trowel for leveling voids, steel garden rake, and a lute-style tool for rough screeding (Belgard). |
Setting the screed height
Pipe height is the one measurement that controls the finished surface. Unilock says pipes should sit 1/2 in. above finished height for sand bedding and 1/4 in. for chip, because the sand compresses when the pavers are compacted. Belgard describes the same logic from the other side: set the base elevation below finished paver height to allow for the sand bed and settlement. If the edge restraint cannot carry a screed board, Belgard says to use screed rails sized for a 1 in. bed and hand-pack sand along both sides of each rail to stabilize it. When a rail is no longer needed, remove it and float the void by hand. Excess sand makes the screed board hard to pull, and open streaks should be filled and rescreeded.
Common mistakes
Both guides say not to walk on the final screed or disturb it. Unilock advises walking on the pavers, not the screed bed, and to lay pavers directly on the bedding course.
Unilock lists setting the screed pipe height incorrectly as a common mistake, because pavers end up high or low after compaction.
Belgard says not to compact the sand bed before laying pavers. Compaction happens after the pavers are down.
Unilock says not to drive a skid steer on the surface unless it is protected from scuffing and rutting, and suggests a pallet jack instead.
Unilock says not to put sand in the joints or on the surface before compaction. Bedding sand moves up into the joints during compaction.
For a thick border or inset, Unilock says to remove the pavers, scrape away excess bedding with a notched wooden guide and reinsert them. For a thin one, add bedding and scrape it to height.
Weather and Pennsylvania notes
Belgard says the sand should be moist but not wet or saturated. Unilock recommends picking a day with no rain expected for sealing and sand installation, so a screeded bed does not get soaked before it is covered with pavers. Neither guide gives frost guidance specific to the bedding layer. The frost issues in Pennsylvania are in the base below it: Belgard says not to place base over frozen subgrade, and that freeze-thaw climates may need deeper excavation, which is covered in how to compact a paver base. The bedding layer follows the slope you built into the base. Unilock recommends 1.5 to 2% on the gravel base, and the bedding is screeded to match it.
Checks before you lay and after
- Chalk lines and string lines on the sand confirm your layout. Belgard suggests parallel lines 5 to 10 ft apart, and starting at a true 90 degree corner. Unilock starts at the house, perpendicular to it, to avoid small sliver cuts.
- Keep joints consistent at about 1/8 in., per Belgard.
- After laying, compact in three directions for at least three passes total with a rubber roller or a plate compactor with a polyurethane pad (Unilock p. 26).
- Polymeric sand is the most common jointing sand. Unilock says to leave it about 1/8 in. below the chamfer, never activate it with water until the surface is clean and dust free, and follow the label exactly.
When to hire a pro
Screeding a small rectangle is a feasible project, but a patio with curves, borders, insets or a slope is much harder to keep flat. Unilock’s 1 in. figure comes with the caveat “unless otherwise specified by engineer,” so jobs with engineered plans should follow the plans. Hire a crew when the patio is large, when machines are needed on the site, or when the base was not built to the tolerances in the earlier steps, because sand cannot fix an uneven base. Cutting pavers is also a safety issue: Unilock notes that OSHA requires dust-free cutting, so use a wet saw or dust control.
Questions
How thick should paver bedding sand be?
About 1 in. after screeding. Belgard says never exceed 1 1/2 in.
Can I use mason’s sand or play sand?
No. Both Belgard and Unilock list mason’s or play sand as materials not to use for bedding.
Why can’t I walk on the screeded sand?
Belgard and Unilock both say not to walk on it or compact it before the pavers go down.
How high should the screed pipes sit?
Unilock says 1/2 in. above finished height for sand bedding and 1/4 in. for chip bedding.
Sources: Belgard Technical Resource Guide, pp. 6, 7, 11, 14, 15; Unilock, How to Build a Patio on Grade, pp. 16 to 28. Checked Nov. 22-23, 2026.
Muthler Landscaping & Construction · Lock Haven, PA
Want it built right?
We build paver patios and walkways in central Pennsylvania, with the base done to the manufacturer’s spec.
Get a quoteAll guidesMuthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.