Guides · Paver patio installation · Step 4

How to start laying pavers

Where you start decides whether the whole patio stays straight. Both manufacturers start from a fixed, square reference and check the lines as they go.

Quick answer

Belgard: start in a 90° corner, check the angle, lay a border course, then the field, with string lines 5 to 10 ft apart and joints near 1/8 in. Unilock: start at the house, perpendicular to it, to avoid sliver cuts. Checked Nov. 23, 2026.

Steps

1. Pick the start

Belgard: a 90° corner, verified before placing pavers (pp. 7, 15). Unilock: start at the house and lay perpendicular to it to avoid sliver cuts.

2. Lay border, then field

Belgard places a border course around the perimeter, then lays the field pattern (p. 7). Blend pavers from several bundles (Unilock).

3. Keep lines straight

Belgard: parallel string lines 5 to 10 ft apart (p. 15). Unilock: check alignment with string or chalk lines as you go.

Joint width

About 1/8 in.

Belgard keeps joints about 1/8 in., within a 1/16 to 3/16 in. range (pp. 6, 17).

Click and drop

Belgard’s method for consistent joints: set the paver against its neighbor, then drop it into place (p. 17).

Don’t walk the bed

Lay from pavers already placed, not from the screeded sand.

What has to be done before the first paver

Laying only works if the base under it is right. Belgard’s minimums: a 4 in. compacted base for patios and sidewalks, excavation at least 8 in. below finished grade, and 10 to 12 in. in freeze-thaw climates, which includes Pennsylvania. Base goes in 2 to 4 in. lifts compacted to 98% standard Proctor, with surface slope of at least 2% for drainage, and the base surface should vary no more than 3/8 in. over 10 ft (pp. 6, 7, 12). Unilock sizes it by soil: 10 to 12 in. of total excavation over well-draining subsoil and 14 to 16 in. over poorly draining subsoil, in 3 in. lifts with at least three passes of a reversible plate compactor. Belgard says never to place base over a frozen subgrade or use frozen base material (p. 12), so late-fall and early-spring starts need care in central Pennsylvania.

Bedding sand is nominally 1 in. uncompacted, never more than 1 1/2 in., and it should be washed concrete sand. Belgard rules out masonry sand, play sand and stone dust (pp. 7, 14); Unilock rules out limestone screenings, mason’s sand and slag because they drain poorly and rut. Screed with rails or 1 in. pipes set 6 to 8 ft apart (Belgard), and do not compact the sand before laying.

No corner? Make a square start

Belgard (p. 16) shows how to build a perpendicular start line when the layout has no corner: mark the midpoint of a 10 to 20 ft edge, use two tapes from the far end to find a point equidistant from the midpoint, and snap a line to the midpoint. A 3:4:5 triangle, shown as 6, 8 and 10 ft, also sets or checks a 90° angle. For herringbone, Belgard says to begin at the 90° corner and follow the illustrated placement order (p. 17).

Blend pallets, and edge the job

Blend the color

Unilock says to check the batch numbers on bundle tags, because bundles from different production runs can differ in color, and to draw pavers from several bundles while installing. Belgard also says to install from multiple pallets (p. 15).

Restrain every edge

Unilock: all edges must be restrained; buildings and rigid structures count. Belgard sets restraint on compacted base with at least 1 in. of vertical surface and excavates at least 12 in. wider than the paver edge (pp. 7, 13).

Hold off near open edges

Belgard says not to compact or fill joints within 3 ft of an unrestrained or incomplete edge (p. 19).

Common mistakes

Surface errors
  • Walking on the final screed (both guides).
  • Putting sand on the surface before compacting (Unilock).
  • Driving a skid steer over unprotected pavers (Unilock).
Base errors
  • Skipping the utility locate before excavating (Unilock).
  • Using cheap, flimsy plastic edging (Unilock).
  • Wrong bedding sand: stone dust, masonry or play sand.
Planning errors
  • No plan for cuts: start at the house or in a square corner.
  • Grill islands or other vertical features with no frost-depth piers (Unilock).
  • Skipping the 2 to 3 week joint re-check (Belgard p. 19).

Pennsylvania inspection and code points

Call Pennsylvania 811 before any excavation; Penn State Extension notes the service is free to homeowners, and Unilock lists skipping the utility locate as a common mistake. Neither manufacturer guide addresses permits, so ask your township whether your patio needs one and whether stormwater or setback rules apply. These pages are planning information only; confirm with your local code office before you dig.

When to hire a professional

Belgard’s tool list includes a vibratory plate compactor rated at least 5,000 lbf, a masonry or cut-off saw and, for bigger jobs, a skid steer and roller (p. 11). Pavers larger than 12 by 12 in. need a roller (p. 8). Poorly draining subsoil, a driveway (Belgard calls for a 6 in. minimum base), a slope that needs a wall, or any job that must be square against the house are the points where a crew with the equipment usually pays for itself.

Before: screed the bedding sand. Next: cut pavers. Pattern terms are in the glossary.

Planning figures, not engineering. Numbers are from manufacturer guides. Your paver’s instructions rule on pattern and joint width.

Questions

Where do you start laying pavers?

Belgard starts in a verified 90° corner. Unilock starts at the house, perpendicular to it, to avoid sliver cuts.

How wide should paver joints be?

Belgard: about 1/8 in., within a range of 1/16 to 3/16 in.

How far apart should string lines be?

Belgard calls for parallel string lines 5 to 10 ft apart.

How deep should the base be in a freeze-thaw climate?

Belgard: excavate at least 8 in. below finished grade, and 10 to 12 in. in freeze-thaw climates, with a 4 in. minimum compacted base for patios.

Can I use play sand or stone dust under pavers?

No. Belgard says use washed concrete sand and rules out masonry sand, play sand and stone dust.

Sources: Belgard Technical Resource Guide, pp. 6-8, 11-19; Unilock, How to Build a Patio on Grade; Penn State Extension (PA 811). Checked Nov. 23, 2026.

Muthler Landscaping & Construction · Lock Haven, PA

Want it built right?

We build paver patios and walkways in central Pennsylvania, with the base done to the manufacturer’s spec.

Get a quoteAll guides

Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.