What Is Spoil in Excavation?
Spoil is the soil, rock and other material dug out of an excavation and set aside, usually in a pile next to the hole, until it is reused as backfill or hauled away.
Why spoil placement matters
A pile of spoil sitting at the lip of a trench adds weight right where the wall is weakest, and loose material can roll back in on workers. OSHA 1926.651(j)(2) requires excavated materials, and equipment, to be kept at least 2 feet from the edge of the excavation, or to be held back by retaining devices or both. Many contractors keep spoil farther back than that, and on a tight lot it is often trucked off and brought back later.
Reusing spoil as backfill
Whether spoil can go back in the hole depends on what it is. Clean, workable soil may be reused. Wet clay, organic topsoil, rubble or frozen lumps usually are not good backfill under a patio, wall or driveway. Your engineer or the project specification decides what is acceptable.
Planning information only, not engineering, legal or safety advice. Confirm requirements with your engineer or the OSHA text.
Equipment counts too
The 2-foot rule in 1926.651(j)(2) covers more than the pile. It applies to excavated material and to equipment alike, so a skid steer, dump truck or stockpile of block parked at the lip of a trench falls under the same requirement. The alternative is a retaining device, or both. The rule gives a minimum, not a safe distance for every soil, so a deeper trench or loose ground can justify putting spoil farther back.
Other OSHA duties that involve the spoil side of a trench
- Daily inspection: a competent person must inspect the excavation, the adjacent areas and the protective systems before work starts, as needed during the shift, and after every rainstorm or other hazard-increasing event (1926.651(k)).
- Surface water: where an excavation interrupts natural surface drainage, diversion ditches, dikes or similar means are required to keep water out (1926.651(h)(3)). A spoil pile that blocks a drainage path can make that harder.
- Exit: trenches 4 feet or deeper need a stairway, ladder, ramp or other safe means of egress, with no more than 25 feet of lateral travel to reach it (1926.651(c)(2)). Spoil should not be stacked where it blocks the exit.
- Utilities: estimated utility locations must be determined before digging, and utility owners are given time to respond (1926.651(b)).
Backfill and removal order
When a support system or shield is in the trench, OSHA 1926.652(e) says removal starts at the bottom and proceeds upward, with backfilling proceeding alongside it. That is the point where stockpiled spoil is usually pushed back in, so it helps to plan where the pile sits relative to the trench, the shield and the equipment that will move it.
Related terms: trench box, shoring, sloping and protective system.
Sources for this section: OSHA 1926.651 and OSHA 1926.652. Planning only. Confirm requirements with the OSHA text and your competent person.
FAQ
How far back should a spoil pile be?
OSHA sets a minimum of 2 feet from the edge, or use of retaining devices. Soil type and depth can call for more.
Can spoil be used as backfill?
Sometimes. It has to be suitable material for the job, which your engineer or specification decides.
Is spoil the same as fill?
Not exactly. Spoil is material removed from the ground. Fill is material placed to raise or backfill an area. Spoil can become fill if it is suitable.