What Is an Excavation? OSHA Definition
An excavation is any man-made cut, cavity, trench or depression in the earth’s surface formed by removing earth.
What counts
That is OSHA’s definition in 1926.650, and it is broad. A footing dig, a utility trench, a basement hole and the cut for a retaining wall base are all excavations. A trench is a narrow, deep kind of excavation. The word matters because OSHA’s excavation rules attach to the hole, not to the size of the job.
Rules that come with one
Before digging, utilities have to be located (1926.651(b)). Workers must be protected from cave-ins unless the excavation is in stable rock or is under 5 feet deep and a competent person finds no sign of a potential cave-in (1926.652(a)). A competent person inspects the excavation daily and after rain or other hazard-raising events (1926.651(k)), and water accumulation needs controls (1926.651(h)). In Pennsylvania, also call 811 before any dig.
Planning information only, not engineering, legal or safety advice. Confirm requirements with the OSHA text and Pennsylvania One Call.
Utility locating details
Under 1926.651(b), the estimated location of underground utilities must be determined before the dig starts. Utility owners are to be contacted within the local response time. If they have not responded within 24 hours, unless state or local law requires a longer period, work may proceed with caution using detection equipment. Surface encumbrances that create a hazard, such as stumps or poles, must be removed or supported under paragraph (a).
Ongoing duties while the hole is open
- Inspections: a competent person inspects the excavation, adjacent areas and protective systems daily, before work starts, as needed during the shift, and after every rainstorm or other hazard-increasing event. Exposed workers leave the area if hazards are found (1926.651(k)).
- Water: workers may not work in accumulated or accumulating water unless adequate protection is in place, and a competent person must monitor water removal equipment (1926.651(h)).
- Spoil and equipment: keep excavated material and equipment at least 2 feet from the edge, or use retaining devices, or both (1926.651(j)(2)).
- Exit and air: trenches 4 feet or deeper need a safe means of exit within 25 feet of lateral travel. Air must be tested before entry into excavations deeper than 4 feet where oxygen deficiency or other hazards may exist.
Common mistakes
Two assumptions cause trouble. The first is that shallow work is outside the rules: an excavation under 5 feet deep is only exempt from the protective system requirement when a competent person examines the ground and finds no sign of a potential cave-in, and the utility, water and spoil rules still apply. The second is that the rules depend on job size. OSHA’s definition attaches to the cut itself, so a short footing trench and a large basement dig are both excavations.
Related terms: spoil, benching, subgrade and trench box.
Source for this section: OSHA 1926.651. Planning only. Confirm requirements with the OSHA text and Pennsylvania One Call.
FAQ
Is a trench an excavation?
Yes. A trench is a narrow excavation. Every trench is an excavation, but not the other way round.
Does a 3-foot hole count?
It is still an excavation. It may be exempt from needing a protective system if a competent person finds no sign of cave-in risk, but the other rules still apply.
When do utilities need to be located?
Before the dig starts. OSHA requires estimated utility locations to be determined first.
Sources
- OSHA 1926.650, definitions
- OSHA 1926.651, specific excavation requirements
- OSHA 1926.652, protective systems
Related
Back to the full glossary. Related terms: Trench and Protective system.
Questions about digging on your property? Contact Muthler Landscaping & Construction.