What Is a Rebar Chair?
A rebar chair is a small support, usually wire or plastic, that holds reinforcing steel up off the ground at the right height so it ends up inside the concrete, not lying at the bottom.
Types
An Iowa DOT materials instruction lists reinforcing steel supports that hold bars in position during the pour, including slab bolsters, high chairs and continuous high chairs, in wire or plastic. Slab bolsters are long supports that carry a bar across a wider span. High chairs hold bars at a greater height. Plastic chairs do not rust, while wire chairs can leave rust marks if they sit too close to the surface.
Why it matters
Rebar that sinks to the bottom of the pour does little good. The design decides where the steel sits and how much concrete covers it, so use chairs of the height your plans call for. The source we used gives no cover figures, and we are not stating any. Chairs are spaced so the steel does not sag between them or get knocked down as the concrete is placed and screeded.
Planning information only. Bar size, height and spacing come from the structural design or your engineer.
Load ratings and wire size
The Iowa DOT memorandum is a state highway document, so its numbers are Iowa’s requirements and not a rule for a residential slab in Pennsylvania. It says contractors must select supports with sufficient load ratings for their intended operations. Steel wire supports must meet minimum wire diameters set out by gauge, running from gauge 0 at 0.3065 inch to gauge 9 at 0.1483 inch in its table. It adds that there is no approved supplier list for steel supports, while plastic supports must come from brands on the state’s approved list. The takeaway is that a chair is a load-bearing part during the pour, not just a spacer.
How plastic chairs are tested
Iowa DOT points to ANSI/CRSI RB4.1 for testing records, or an independent lab certification. The certification lists a load category of no rating, 200, 400, 600 or 800 pounds, plus pass or fail results for impact, water absorption (for polymers only) and concrete consolidation. In the point-load test, a number 4 bar rests on the support, which sits on three-quarter inch fir plywood and is loaded at half an inch per minute until failure. Failure means the support breaks, deforms more than half an inch, or gouges the plywood more than 0.1 inch. Continuous supports are tested at their weakest point and also under a linear load using a one-foot plate.
What the source does not cover
The memorandum does not address chair spacing, tying the bars, epoxy-coated bars, concrete cover or placement tolerances. It refers readers to Section 2404.03 E of the Iowa DOT standard specifications and to ANSI/CRSI RB4.1 for those. We are not stating spacing or cover figures here, because they come from the structural drawings and the governing code.
Common mistakes
Picking a chair by height alone and ignoring its load rating is the first. A chair that deforms under the crew or the bar is no longer holding the steel where the drawings put it. The second is choosing a wire chair for the plan’s height without checking its wire size against the project’s requirements. The third is assuming any plastic chair has been tested, when the memorandum requires documented test results and a listed brand on that state’s projects. Ask the supplier for the product’s published load rating and compare it with what your engineer or inspector requires.
Planning information only. Confirm reinforcement details with your engineer and your local code office. Related terms: isolation joint and construction joint. Source for this section: Iowa DOT Materials Instructional Memorandum 451.01.
FAQ
Can I use bricks or stones instead?
Purpose-made chairs are the normal approach. Improvised supports can crack, shift or create weak spots in the concrete.
Is pulling rebar up during the pour acceptable?
It is a common shortcut but unreliable. Chairs set before the pour keep the steel where it was designed to be.
Wire or plastic?
Both are listed by the Iowa DOT. Plastic avoids rust staining on exposed surfaces.