A construction joint is the surface where one concrete placement ends and the next one begins, such as at the end of a day’s pour.
Why they exist
NRMCA describes construction joints as the places where two placements meet, and the Portland Cement Association (PCA) calls them stopping points. Concrete cannot always be placed all at once. A large slab may be poured in sections, or work may stop at the end of a day. Wherever the pour stops, a joint results.
Planning them well
Planners often locate them at control joint lines so one joint does two jobs, which keeps the number of lines in the slab down. A cold joint left at a random spot can crack or show a visible line. How the edge is formed and tied to the next placement depends on the design, so follow the plans or ask your contractor.
Load transfer and keys
NRMCA says a construction joint can be designed to transfer load across it, and that reinforcement can run through it. One way to do that is a keyway. In interior slabs the key can be galvanized metal, and in slabs at least 5 inches thick a beveled 1 by 2 inch strip can form the key. NRMCA does not recommend keyed joints for industrial floors. Keys also help prevent edge curling or warping at the joint.
Dowels for heavy loads
Slabs that carry heavy loads need metal dowels across the joint. NRMCA warns that misaligned dowels restrain the slab and can cause random cracking. For heavy-traffic industrial floors, the joint fill must support the edges to prevent spalling.
Doing two jobs at once
PCA notes that some construction joint types can also serve as contraction joints. NRMCA’s spacing limit for contraction joints is 24 to 36 times the slab thickness and never more than 15 feet, with nearly square panels, so the stopping point for a day’s pour can be chosen to fall on one of those lines instead of adding another.
Common mistakes
- Not planning joint locations in advance. NRMCA lists this among the causes of uncontrolled cracking.
- Misaligned dowels that restrain the slab and cause random cracks.
- Edge curling or warping at the joint, which keys help prevent.
- Using keyed joints where NRMCA advises against them, such as industrial floors.
Related terms: saw-cut joint, expansion joint, slump and rebar chair. Added details come from NRMCA CIP 6 and the Portland Cement Association joints page.
Planning information only. Joint details for your slab come from the project design or your concrete contractor.
FAQ
Is a construction joint the same as a control joint?
No. A construction joint is where pours meet. A control joint is a weakened line cut into one pour. One joint can serve as both when planned that way.
Can I avoid them?
On a small slab, often yes, by pouring it in one go. Larger slabs usually need them.
What is a cold joint?
A common term for a joint where fresh concrete meets concrete that has already begun to set, which can be a weak plane if not planned.
Sources
- NRMCA CIP 6, Joints in Concrete Slabs on Grade
- Portland Cement Association, Joints: what types are used and where
Related
Back to the full glossary. Related terms: Control joint and Isolation joint.
Planning a concrete slab or driveway? Contact Muthler Landscaping & Construction.