A control joint, also called a contraction joint, is a planned weak line cut or formed into a concrete slab so that shrinkage cracks form in the joint instead of at random across the surface.
Spacing
The National Ready Mixed Concrete Association (NRMCA) says maximum joint spacing is 24 to 36 times the slab thickness, and not over 15 feet. Panels should be roughly square, with length no more than 1.5 times the width. The Portland Cement Association (PCA) gives a similar rule of thumb: spacing in feet of about 2 times the slab thickness in inches when aggregate is up to ¾ inch, or 2.5 times for larger aggregate. PCA adds that heavy-load slabs 8 inches thick or more should have joints no more than 15 feet apart. For a 4-inch patio, those rules point to about 8 to 12 feet.
Depth
NRMCA calls for a groove at least one quarter of the slab thickness and no less than 1 inch deep. A saw cut that is too shallow will not control cracking. Timing matters too, since concrete cut too late cracks first.
Why slabs crack in the first place
NRMCA explains that concrete shrinks as it sets and dries. If something restrains that shrinkage, tensile stress can exceed the concrete’s low tensile strength and it cracks. Early cracks mostly come from temperature change and contraction while the concrete is setting, and later drying shrinkage widens those cracks or starts new ones. A control joint gives the slab a weak line where that stress can release, so the crack happens where you planned it.
How the layout works on residential slabs
NRMCA gives a 4 inch slab as an example, with joints about 10 feet apart, and says never to exceed 15 feet. Keep panels nearly square, with length no more than 1.5 times the width, and avoid L-shaped panels. PCA adds that slabs 8 inches or thicker under heavy loading, where load transfer across the joint matters, should have joints no more than 15 feet apart so aggregate interlock keeps working. PCA also notes that some construction joint types can serve as contraction joints.
Ways to form one
NRMCA lists three methods. Saw cutting is done after the concrete hardens, using an early-entry dry-cut saw about 1 to 4 hours after finishing or a conventional saw at 4 to 12 hours. Tooled joints are run early in finishing and then rerun later so the groove does not bond back together. Preformed strips are inserted before finishing. Early-entry cuts are shallower than conventional cuts but still need to be at least 1 inch deep.
Common mistakes
- Cutting too late, which makes sawing difficult and invites uncontrolled cracking.
- Not planning joint locations and sawing times before the pour.
- Leaving out isolation joints where the slab meets columns, walls, footings and driveways. NRMCA lists this among the mistakes behind random cracking.
- Expecting wire mesh to prevent cracking. NRMCA says mesh does not stop cracks but can keep the joints from opening, and recommends cutting alternate wires or stopping it at contraction joints.
Related terms: expansion joint, construction joint, bleed water and slump. Added details come from NRMCA CIP 6 and the Portland Cement Association joints page listed under Sources.
Planning information only. Final joint layout comes from the project design or your concrete contractor.
FAQ
Do control joints stop cracks?
No. They control where cracks happen, so the crack follows a clean line at the joint.
How deep should they be?
At least a quarter of the slab thickness and no less than 1 inch, per NRMCA.
Is it the same as an isolation joint?
No. An isolation joint separates a slab from something fixed, such as a wall or footing. A control joint splits up the slab itself.
Sources
- NRMCA CIP 6, Joints in Concrete Slabs on Grade
- Portland Cement Association, Joints: what types are used and where
Related
Back to the full glossary. Related terms: Saw cut joint and Isolation joint.
Planning a concrete slab or driveway? Contact Muthler Landscaping & Construction.