What Are Permeable Pavers? PICP Defined
Permeable pavers, often called PICP for permeable interlocking concrete pavement, are pavers laid with open joints filled with small stone so stormwater can pass through into a stone base below.
What permeable pavers mean
CMHA’s glossary for segmental pavements covers permeable interlocking concrete pavement as a system that lets water drain through the joints. Instead of fine joint sand, the openings are filled with clean small stone, and the base is an open-graded stone layer that stores and releases the water. It is a stormwater tool as much as a paving surface.
Where it comes up
It comes up where runoff rules or drainage problems matter, such as driveways, parking areas and patios. Whether a permeable system suits a site depends on soil, slope and local stormwater rules. Those are design questions for an engineer or your municipality. See also our rain garden size calculator for another way to handle runoff.
In the field
The base is built differently from a standard paver base, using crushed stone that stays open instead of packing tight. Do not substitute standard base material. Follow the CMHA design guidance and the manufacturer’s instructions.
The layers in a permeable system
CMHA’s technical note on permeable interlocking concrete pavement (PAV-TEC 018) lists each layer by stone size. Joints are filled with ASTM No. 8, 89 or 9 angular stone, to within 1/4 inch of the paver surface. Under the pavers sits a 2-inch bedding course of No. 8 crushed stone. Below that is a base reservoir of ASTM No. 57 stone, placed as a 4-inch lift, and below that a subbase reservoir of No. 2 stone (No. 3 or 4 are also listed) in lifts up to 6 inches, with thickness set by water storage and traffic loads. Pavers are at least 3 1/8 inches thick for vehicle areas and 2 3/8 inches for pedestrian areas. For pedestrian applications the base needs a minimum of 6 inches and the subbase may be omitted.
Site limits and common mistakes
The biggest surprise for crews used to standard pavers is the subgrade: it is generally not compacted, because compaction substantially reduces infiltration. Compact only if the engineer specifies it, for example in some poorly draining clays. Equipment that compacts the soil by accident causes a substantial loss of infiltration. Other limits in the same note: the seasonal high water table should be more than 2 feet below the bottom of the base, the system should be at least 100 feet from water supply wells, and the surface slope should be under 12 percent and typically 5 percent or less. Where there are no concrete curbs, geotextile is required along the sides.
Testing and upkeep
The recommended field test for surface infiltration is ASTM C1701, with a minimum of 100 inches per hour. Standard vacuum equipment cleans the surface and can restore a clogged one. About six months after installation the joints should be inspected and topped up wherever the stone has settled more than 1/4 inch. No sealer is required. The note also says the pavement can be installed in cold weather if the subgrade and aggregates stay unfrozen and can be plowed with municipal snow removal equipment.
Planning information only. Design, soil testing and approvals for stormwater systems come from an engineer and your local code office.
Related terms
See infiltration trench, drawdown time and positive overflow for the stormwater side, and subgrade for the soil beneath.
Additional source: CMHA PAV-TEC 018, permeable interlocking concrete pavement.
Frequently asked questions
What does PICP stand for?
Permeable interlocking concrete pavement.
Does it need maintenance?
Yes. The joints can clog with fines over time, so they need occasional cleaning per the manufacturer’s guidance.
Will it work on any soil?
Not necessarily. Soil drainage and site conditions decide it, so ask a qualified designer.
Sources
Related
- Hardscape glossary
- Related terms: subbase and crushed stone
- Free tools and calculators
Planning a paver project in central PA? Contact Muthler Landscaping & Construction for a straight answer on drainage and base.