What Is Joint Sand? Paver Joint Fill Defined

Joint sand is the sand swept into the gaps between pavers after they are laid. It fills the joints so the units can lock together and act as one surface.

What joint sand means

CMHA’s glossary for segmental pavements treats joint sand as the material that fills the joints between units. It is a key part of interlock, because the filled joints let the pavers share load with their neighbors. The sand type and gradation should match the paver manufacturer’s instructions.

Where it comes up

Quotes may list plain joint sand or polymeric sand, which contains a binder that sets when wetted. Our polymeric vs regular sand article compares the two. It is a different material from bedding sand, which sits under the pavers.

In the field

Joints are filled after the units are compacted, and the surface is swept clean. Joint width is set by the unit’s spacer bars. Sand can wash out over time, so topping up joints is normal upkeep.

What the sand has to meet

CMHA’s tech note on specifying interlocking pavements (PAV-TEC-009) calls for joint sand that meets the grading of ASTM C144, with modifications, or the bedding sand requirements. It must be clean, non-plastic, free of foreign matter and symmetrically shaped, either natural or manufactured from crushed rock. Stone dust is prohibited. A coarser ASTM C33 sand may be used, following the rule of using the coarsest sand whose largest particles still enter the narrowest joint. For 2 mm joints that means sand 2 mm and smaller. CMHA’s interlock note (PAV-TEC-004) gives the C144 gradation as 100 percent passing the No. 16 sieve with no more than 5 percent passing the No. 200 sieve.

Joint width and how joints are filled

Joints between pavers run 1/16 in. to 3/16 in. (2 to 5 mm), and no more than 5 percent of joints may exceed 1/4 in. (6 mm). Dry joint sand is spread, swept and compacted at the same time until the joints are full, which takes at least four passes with a plate compactor of 5,000 lbf or more at 75 to 100 Hz. Do not compact within 6 ft of an unrestrained edge. CMHA’s tolerance note (PAV-TEC-015) says the joints must be completely filled with consolidated sand after final compaction, and that a putty knife should penetrate no more than 1/4 in. when checking.

Common mistakes

  • Using stone dust or fine, dirty sand that packs poorly or holds water in the joint.
  • Sweeping sand over wet pavers or installing sand during heavy rain, snow, or when it is frozen or saturated. PAV-TEC-009 says not to.
  • Leaving the laying face unfinished overnight. Work within 6 ft of the laying face should end the day compacted with sand-filled joints, and incomplete areas should be covered with plastic so bedding sand does not saturate.
  • Leaving excess sand on the surface after the job. It is removed and the surface broom cleaned, unless it is intentionally left to protect pavers from other trades.

Related terms: plate compactor, compaction, concrete sand and edge restraint.

Sources for this section: CMHA PAV-TEC-009, CMHA PAV-TEC-004 and CMHA PAV-TEC-015. Follow the paver manufacturer’s instructions for your product.

Frequently asked questions

Is joint sand the same as bedding sand?

No. Bedding sand is the leveling layer under the pavers. Joint sand fills the gaps between them.

Do I need polymeric sand?

It is an option, not a rule. Follow the paver manufacturer’s guidance for your product and use.

Why do joints need to be full?

Full joints are what let neighboring pavers transfer load and stay interlocked.

Sources

Related

Planning a paver patio in central PA? Contact Muthler Landscaping & Construction for a straight answer on layout and base.