We handle select demolition on site and building projects: concrete, pavement, walls, slabs and small structures, with loading and haul-off. Work involving asbestos, lead or other regulated materials goes to licensed abatement contractors, not to us.

Call (570) 397-9800How we bid

What a demo bid covers

ItemWhat we price
Concrete and pavementSaw cut, break, load and haul-off
Slabs and footingsRemoval to the depth the plans show
Walls and small structuresSelect demolition of items marked on the demo plan
DisposalHauling to an approved disposal or recycling site, with tickets on request

Hazardous material surveys and abatement are not in our scope. We ask for the survey report before pricing any building demo. Protection of items to remain, utility disconnects and dust control are listed in the proposal.

What we need to price it

Demo plan
  • Items to remove and to remain
  • Depths and extents
Survey
  • Hazardous material survey, if a building
  • Utility disconnect status
Logistics
  • Haul-off and disposal requirements
  • Access and working hours

General background: surveys and utilities before demolition

This section is general education from public sources. It is not a statement about a specific project.

OSHA’s demolition standard (29 CFR 1926.850) requires that, before demolition starts, a competent person make an engineering survey of the structure’s framing, floors and walls and of the possibility of unplanned collapse, including adjacent structures where employees may be exposed. The employer must have written evidence that the survey was done. Electric, gas, water, steam, sewer and other service lines must be shut off, capped or otherwise controlled outside the building line, and any utility company involved must be notified in advance. If hazardous chemicals, gases, explosives or flammable materials were used in pipes, tanks or equipment and their presence is apparent or suspected, testing and purging must be done and the hazard eliminated before demolition starts.

General background: asbestos notification

The EPA’s asbestos NESHAP work practices apply to demolitions and renovations of all structures, installations and buildings, excluding residential buildings with four or fewer dwelling units. The EPA says the owner or operator must notify the appropriate state agency before any demolition, and before renovating buildings that could contain a threshold amount of asbestos-containing material. The detailed inspection and training rules are in 40 CFR 61.145. This is why a building demo bid is normally tied to a hazardous material survey.

General background: dust when breaking and cutting concrete

OSHA’s silica standard for construction lets employers follow Table 1 control methods for tasks such as saw cutting, jackhammering, drilling and heavy equipment used in demolition, instead of measuring exposure. Every covered employer must have a written exposure control plan and designate a competent person to implement it. OSHA notes that applying water to a saw blade substantially reduces dust.

Sources: OSHA 29 CFR 1926.850 (osha.gov); US EPA, Asbestos NESHAP page (epa.gov); OSHA, Respirable Crystalline Silica in Construction (osha.gov/silica-crystalline/construction). Checked Nov 23, 2026. General information, not legal advice. Confirm current requirements with the regulating agency.

Questions

Do you handle asbestos?

No. Regulated material is removed by licensed abatement contractors before our work starts.

Do you take the debris away?

Yes. Loading and haul-off are part of a normal demo bid unless the plans say otherwise.

Is a survey required before a building is demolished?

OSHA requires an engineering survey by a competent person before demolition starts. The EPA says the owner or operator must notify the appropriate state agency before any demolition covered by the asbestos NESHAP, which excludes residential buildings with four or fewer dwelling units.