[Project name] · [Client name]
[Property address]
Date: [Date] · Estimate #[000] · Prepared by [Name]
[Company]
INTERNAL: not for the customer
Price it here first. Once the number holds up, send the landscape and hardscape proposal, which carries the scope, schedule, payment terms and signatures. The estimate is your cost build-up; the proposal is the document the customer signs.
1. Job and measurements
| Item | Measurement | Source |
|---|---|---|
| Patio / paved area | [sq ft] | [plan sheet / site measure] |
| Wall length and height | [LF x ft high = face sq ft] | [plan sheet] |
| Excavation depth (base + paver + bedding) | [in.] | [spec] |
| Access, haul distance, staging area | [notes] | [site visit] |
| Soil, water, slope or utility concerns | [notes] | [site visit / 811] |
Run each quantity through a calculator before it goes in a cell: paver calculator, retaining wall block calculator, gravel calculator, gravel compaction calculator, concrete calculator, French drain calculator.
2. Site prep and excavation
| Line | Qty | Unit | Unit cost | Total |
|---|---|---|---|---|
| Excavation / cut | [ ] | cu yd | [$] | [$] |
| Spoil haul-off and dump fees | [ ] | [loads / tons] | [$] | [$] |
| Grading and subgrade compaction | [ ] | sq ft | [$] | [$] |
| Erosion control / protection | [ ] | [unit] | [$] | [$] |
| Site prep subtotal | [$] | |||
3. Materials and waste
Order quantity = takeoff quantity x (1 + waste %). Set waste from your own past jobs and the manufacturer’s guidance, not from a rule of thumb you read online. Cuts, curves, borders and breakage change it job to job.
| Material | Takeoff qty | Waste % | Order qty | Unit cost | Total |
|---|---|---|---|---|---|
| Pavers / slabs | [sq ft] | [%] | [ ] | [$] | [$] |
| Wall block and cap | [face sq ft / units] | [%] | [ ] | [$] | [$] |
| Base stone | [tons] | [%] | [ ] | [$] | [$] |
| Bedding and joint sand | [ ] | [%] | [ ] | [$] | [$] |
| Fabric, geogrid, edge restraint | [ ] | [%] | [ ] | [$] | [$] |
| Drain pipe, drainage stone, fittings | [ ] | [%] | [ ] | [$] | [$] |
| Adhesive, fasteners, sealer, consumables | [ ] | [%] | [ ] | [$] | [$] |
| Topsoil, seed, plants, mulch | [ ] | [%] | [ ] | [$] | [$] |
| Delivery / freight / fuel surcharge | [ ] | n/a | [ ] | [$] | [$] |
| Materials subtotal (before sales tax) | [$] | ||||
Flag any special-order item and its price here. If the job is a Pennsylvania home improvement contract over $5,000, the contract has to list special-order materials separately from the down payment (see the note under section 7).
4. Labor
| Task | Crew size | Hours each | Total hours | Loaded rate / hr | Total |
|---|---|---|---|---|---|
| Layout, excavation, base | [ ] | [ ] | [ ] | [$] | [$] |
| Paver / block setting, cuts | [ ] | [ ] | [ ] | [$] | [$] |
| Drainage, backfill, grading | [ ] | [ ] | [ ] | [$] | [$] |
| Cleanup, restoration, punch list | [ ] | [ ] | [ ] | [$] | [$] |
| Drive, load and unload time | [ ] | [ ] | [ ] | [$] | [$] |
| Labor subtotal | [$] | ||||
Use a loaded rate: wages plus payroll taxes, workers’ compensation, insurance and benefits, not the hourly wage on the paycheck. Add drive and load time as its own line so it does not disappear.
5. Equipment
| Machine / tool | Owned or rented | Hours / days | Rate | Mobilization, fuel | Total |
|---|---|---|---|---|---|
| [Skid steer / excavator] | [ ] | [ ] | [$] | [$] | [$] |
| [Plate compactor] | [ ] | [ ] | [$] | [$] | [$] |
| [Saw, dump trailer, other] | [ ] | [ ] | [$] | [$] | [$] |
| Equipment subtotal | [$] | ||||
6. Subcontractors, permits and disposal
| Item | Vendor | Quote date | Amount |
|---|---|---|---|
| Electrical, plumbing, concrete or other sub | [ ] | [ ] | [$] |
| Engineering, survey, permit fees | [ ] | [ ] | [$] |
| Dumpster or extra haul-off not counted in section 2 | [ ] | [ ] | [$] |
| Subs, permits, disposal subtotal | [$] | ||
7. Totals and price
| A. Direct cost (sections 2 through 6) | [$] |
| B. Overhead allocation: A x [ ]% | [$] |
| C. Contingency: (A + B) x [ ]% | [$] |
| D. Total cost to cover: A + B + C | [$] |
| E. Target profit margin on price: [ ]% | |
| F. Price: D divided by (1 minus E) | [$] |
| G. Sales tax, if it applies (see note) | [$] |
| H. Deposit check: one-third of F on a Pennsylvania home improvement contract over $5,000 | [$] |
Divide by (1 minus margin); do not multiply by (1 plus margin). A 25% markup on cost is only a 20% margin on price. The job cost spreadsheet shows the arithmetic and tracks the real result after the job.
Sales tax: Pennsylvania’s business licensing guide says construction contractors are not required to collect sales tax on construction activity, while the Department of Revenue says a contractor owes tax on the components of a real estate structure it buys. Treatment of landscaping services can differ. Confirm your job type with the Department of Revenue or your CPA before you fill in line G.
Pennsylvania deposits: on a home improvement contract over $5,000 the deposit cannot exceed one-third of the price, plus the cost of special-order materials designated in the written contract (73 P.S. 517.9(10)), and no payment may be taken before the contract is signed (517.9(9)).
8. Price calculator (optional)
Type your direct cost and percentages. Nothing is saved or sent.
How to use this estimate worksheet
Work top to bottom. Measure first, take off quantities with the calculators, add waste to materials, price labor at a loaded rate, then add equipment, subs and disposal. Overhead, contingency and margin come last, and the price falls out of the formula. Then send the proposal after you price it here.
Estimate vs proposal: what each one is for
The estimate is internal: quantities, unit costs, hours and the math behind the price. The proposal template is external: scope, plan sheets, a single price, payment schedule, exclusions and signatures. Keeping them apart means the customer never sees your unit costs, and you never send a price you have not built up.
Waste, contingency and overhead
Waste belongs on each material line. Contingency covers conditions you cannot see yet, such as rock, soft subgrade or an unmarked line. Overhead is the share of rent, insurance, office, vehicles and admin that each job has to carry. Set all three from your own books and past jobs, then review them after every job against the job cost spreadsheet.
Common misses
- Haul-off and dump fees for spoil you dug out.
- Drive, load and unload time, and fuel.
- Base depth that matches the actual soil, not the best case.
- Special-order lead times and freight.
- Cleanup and lawn restoration at the end.
Go deeper on the takeoff
Our guide on how to estimate a paver patio walks the takeoff step by step. The rest of the free forms are on the contractor templates page, including the invoice template for landscapers you will use once the job is sold, and more calculators are on the hardscape calculators page.
If you would rather not draw and measure every job yourself, we draw plans for contractors under your logo, with a takeoff to price from.
Sources: PA Home Improvement Consumer Protection Act, 73 P.S. 517.7(a)(9) (down payment and special-order amounts listed separately), 517.9(9) and 517.9(10) (no payment before signing; deposit limit) (codes.findlaw.com/pa/title-73-ps-trade-and-commerce/pa-st-sect-73-517-9/ and pa-st-sect-73-517-7/); PA Department of Revenue, Sales, Use and Hotel Occupancy Tax, Building Machinery and Equipment (pa.gov/agencies/revenue/resources/tax-types-and-information/sales-use-and-hotel-occupancy-tax/building-machinery-and-equipment); PA Business One-Stop Hub, Construction Contractors/Landscapers guide (hub.business.pa.gov/Home/HelpCenterDetail/ConstructionContractorsLandscapers). The margin formula is arithmetic.
Questions
What is the difference between an estimate and a proposal?
An estimate is your internal cost build-up: quantities, unit costs, labor hours, equipment and margin. A proposal is the customer-facing document with scope, price, payment terms and signatures. Price the job on the estimate, then send the proposal.
How do I price a hardscape job from the estimate?
Add direct cost (site prep, materials with waste, labor, equipment, subs and disposal), add overhead and contingency, then divide by one minus your target margin. That gives the price.
Should waste be a flat percentage?
No. Set it per material from your own past jobs and the manufacturer’s guidance. Cuts, curves, borders and breakage vary by design and product.
How much deposit can I take on a Pennsylvania home improvement job?
On a contract over $5,000, no more than one-third of the price plus the cost of special-order materials designated in the written contract, and nothing before the contract is signed (73 P.S. 517.9). Have a Pennsylvania attorney review your contract form.
Template by Groundwork Design Co., the design studio of Muthler Landscaping & Construction LLC, Lock Haven, PA. A starting point, not legal or tax advice: have your attorney and CPA review it before you rely on it.