Cap Unit (Retaining Wall Capstone)

A cap unit, also called a capstone, is the finishing block set on the top of a segmental retaining wall. It covers the open tops of the blocks below.

What a cap unit means

Henkel, the maker of Loctite landscape block adhesive, describes the top course as capstones that cover the open tops of the wall blocks and give the wall a finished look. Its guide says the wall blocks interlock, but adhesive bonds the cap to the course below and helps keep the top from sliding. That is a product maker’s guide, so it promotes its own product. Check your block manufacturer’s instructions for the cap method they approve.

Where it comes up

Caps are listed on wall quotes and takeoffs as a separate item from wall block, since they are often a different unit. Henkel’s guide says to finish the wall height, then backfill and compact, then cut and dry-fit the caps before applying adhesive.

In the field

Caps are the last thing placed, and they are the part homeowners see and touch. Loose caps usually mean the adhesive step was skipped. See segmental retaining wall and gravity wall.

Where capping fits in the build sequence

The National Concrete Masonry Association’s Segmental Retaining Wall Installation Guide treats capping as part of the final step it calls capping and finish grading, which comes after the wall and backfill are in place. It describes the cap or coping unit as optional, installed per the manufacturer’s details with the approved adhesive. It adds that the pins, clips and adhesives should be the ones made for the wall system in use. So a cap is not a universal requirement on every segmental wall, and the system manufacturer decides how it attaches.

Finishing the top of the wall

The NCMA guide says the top of the wall is then finished with approximately 8 in. of low-permeability soil, which limits how much surface water infiltrates into the reinforced zone behind the face. Grades at the top and the bottom of the wall should direct water away from it. Topsoil, vegetation or paving should follow as soon as possible to protect against erosion on top of the wall and at either end. The guide gives no overhang dimension and no cutting instructions for caps, so we do not quote any.

How one manufacturer describes the adhesive step

Henkel’s guide for its Loctite landscape block adhesive gives a short sequence. Cut the caps and dry-fit them first. Cut the cartridge nozzle tip at a 45 degree angle to set the bead size, then run two beads on each cap, one 2 in. from the front edge and one 2 in. from the back edge. Press each capstone down firmly, then check that all the caps are aligned and level. For 90 degree inside or outside corners, it says to use the adhesive on all the interlocking corner blocks. The guide does not cover surface preparation, temperature limits or cure time, so follow the product label and your block maker’s instructions for those. This is one manufacturer’s method for its own product, not a standard.

Frequently asked questions

Are retaining wall caps glued down?

Manufacturer guidance like Henkel’s calls for landscape block adhesive on caps. Follow your block maker’s instructions.

Is a cap the same as coping?

The terms overlap, and we did not find an authoritative source separating them, so we use cap unit here for segmental walls.

When are caps installed?

After the wall is built to height, backfilled and compacted, per Henkel’s guide.