Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

What Is Bridging Between Joists?

Bridging is bracing installed between joists to keep them from twisting or rolling over. The model residential code allows three forms: solid blocking, diagonal bridging and a continuous 1×3 strip.

When the IRC calls for it

Under the model IRC, joist ends need lateral support, typically full-depth solid blocking, a full-depth header, band or rim joist, or an adjoining stud (R502.7). Joists deeper than 2×12 also need bridging at intervals of 8 feet or less, using solid blocking, diagonal bridging or a continuous 1×3 strip (R502.7.1). Trusses, I-joists and similar engineered members follow the manufacturer’s bracing instructions instead.

Planning information only, not engineering or legal advice. Confirm the requirement in the code edition your town enforces.

How bridging is used in floor framing

The 2015 International Residential Code describes the three bridging methods in practical terms. Solid blocking is cut to fit between joists. Diagonal bridging can be wood or metal. The third method is a continuous 1×3 strip nailed across the bottoms of the joists, perpendicular to them. Whichever method is used, spacing must not exceed 8 feet (R502.7.1). The code’s solid blocking at joist ends must be full depth and at least 2 inches nominal thick (R502.7).

On a deck the picture is different. The American Wood Council deck guide (DCA 6) does not address bridging at all. It mentions blocking in two places. Diagonal bracing connects at its far end to a joist or to blocking between joists, and if a joist does not align with the brace location the guide says to provide blocking between the next adjacent joists (p. 15, Figure 22). Metal plate connected trusses may need special blocking under the WTCA technical note (p. 10).

Common mistakes and limits

One mistake is assuming every floor needs a row of bridging. In the model code, the bridging rule is tied to joists deeper than a nominal 2×12, which is a different trigger from the joist-end support rule. Another is applying the lumber rule to engineered members. Trusses, structural composite lumber, glulam and I-joists follow the manufacturer’s recommendations, and those products also may not be cut, notched or bored unless the manufacturer permits it or a registered design professional has considered the effect (R502.8.2).

Seismic rules add a third limit. In Seismic Design Categories D0, D1 and D2, the code requires lateral restraint at each intermediate support as well as at the ends (R502.7). Your code office can tell you which seismic category applies to a given site.

Bridging also gets in the way of other work. For sawn lumber, the code limits holes to one-third of the joist depth in diameter and requires them to be at least 2 inches from the top and bottom edges and from other holes or notches (R502.8.1). Anyone drilling joists near blocking should follow those limits. This page quotes the 2015 edition from ICC, so check the edition your town adopted.

Related terms

Bridging works alongside rim joists and headers that support joist ends. See beam for the member that carries the joists themselves.

Source line for this section: International Residential Code 2015, chapter 5 (R502.7, R502.7.1, R502.8), via ICC; American Wood Council, DCA 6 (pp. 10 and 15).

FAQ

Do all joists need bridging?

Under the model IRC, the bridging rule applies to joists deeper than 2×12. All joist ends still need lateral support.

Do I need bridging with I-joists or trusses?

Follow the manufacturer’s bracing instructions for engineered members rather than the dimensional lumber rule.

Sources

Related

Back to the full glossary. Related terms: Blocking and Joist.

Planning a deck or addition? Contact Muthler Landscaping & Construction.