What Is Blocking in Framing?
Blocking is short pieces of lumber fitted between joists, studs or rafters. It stiffens the frame, keeps members from rotating and gives something solid to fasten to.
Blocking in decks
The American Wood Council’s deck guide (DCA 6) shows blocking set between joists to support diagonal bracing where a joist does not line up with the brace (Figure 22, p. 15). For truss floor systems it points to the truss designer’s standard detail (p. 10).
Blocking in house floors
The model residential code uses full-depth solid blocking as one way to keep joist ends from rolling (R502.7). Blocking used to fasten panel edges or fixtures must be at least utility grade (R502.2.2), and split double joists that leave room for pipes or vents need solid blocking at least every 4 feet (R502.4).
Blocking at the joist ends
R502.7 says joists must be supported laterally at their ends by full-depth solid blocking at least 2 inches nominal thick, or by attachment to a full-depth header, band or rim joist, or to an adjoining stud. Trusses, structural composite lumber, glued-laminated members and I-joists follow the manufacturer’s recommendations instead. In Seismic Design Categories D0, D1 and D2, the code also requires lateral restraint at each intermediate support. The deck chapter has its own lateral restraint section for deck joists (R507.5.1), so a deck is not covered by the floor rule alone.
Blocking versus bridging
The two terms overlap because the code lets blocking do the bridging job. For joists deeper than a nominal 2×12, R502.7.1 requires lateral support from solid blocking, diagonal bridging in wood or metal, or a continuous 1×3 strip nailed across the bottoms of the joists. That support must occur at intervals of no more than 8 feet. Blocking is the full-depth option. Diagonal bridging and the 1×3 strip are the alternatives, and the bridging entry covers them.
Blocking for deck bracing
DCA 6 requires diagonal bracing on a free-standing deck more than 2 feet above grade, unless the deck is attached to the house. Braces run both parallel and perpendicular to the beam at each post. Parallel braces bolt to the post and the beam, while perpendicular braces bolt to the post and to either a joist or blocking (p. 15). Blocking is what catches the brace when no joist falls in the right place.
Common mistakes and limits
- Leaving deep joists unrestrained. Floor joists larger than 2×12 need bridging or blocking at 8-foot intervals under R502.7.1.
- Using ordinary blocking details on engineered floors. The code defers to the manufacturer for trusses, composite lumber, glulam and I-joists.
- Treating the deck guide as the detail for truss floors. DCA 6 calls for a truss designer’s standard detail, a free-standing deck or a full plan submission where the house has a metal-plate-connected truss floor (p. 10).
- Using low-grade scraps. Blocking used for fastening panel edges or fixtures must be at least utility grade.
Planning information only, not engineering or legal advice. Confirm requirements with your code office.
FAQ
Is blocking the same as bridging?
They overlap. Solid blocking is one of the ways to provide bridging between deep joists. Blocking is also used for fastening and for supporting braces.
What is blocking used for on a deck?
One use shown in the AWC guide is supporting diagonal bracing where a joist does not meet the brace.
Sources
- American Wood Council, DCA 6 Prescriptive Residential Wood Deck Construction Guide
- International Residential Code, chapter 5, floors (2015 model code text)
Related
Back to the full glossary. Related terms: Bridging, Rim joist, Joist and Header.