Public works projects over $25,000 in Pennsylvania must pay prevailing wages set by the Department of Labor & Industry. We bid prevailing wage work and price it from the project’s wage determination, not from our regular rate card.

Call (570) 397-9800How we bid

The rules in short

TopicWhat L&I says
ThresholdEstimated total cost over $25,000. Projects cannot be split to fall below it. Locally funded highway and bridge projects contracted after January 1, 2014 have a $100,000 threshold.
Covered workConstruction, reconstruction, demolition, alteration and repair, other than maintenance, paid for in whole or in part with public funds.
Who must payContractors and subcontractors. Public financing in whole or in part can trigger it, including for private developers.
Certified payrollSubmitted weekly to the public body. Records are kept at least 2 years.
RatesSet by L&I per project by craft, classification and county. Four types: building, highway, heavy and residential.
PenaltiesIntentional violations can mean three-year debarment, back wages and referral to the Attorney General. Falsified payrolls can be prosecuted as a misdemeanor.

Source: Pennsylvania Department of Labor & Industry, Prevailing Wage FAQs (pa.gov/agencies/dli), checked Nov 22, 2026. This is a summary, not legal advice. Rates and rules change, so confirm against the bid documents and L&I.

How we handle it

At bid
  • We ask whether the job is prevailing wage
  • We price labor from the wage determination in the specs
On the job
  • Weekly certified payroll goes to the public body
  • Classifications follow the determination
Why it matters
  • The rate card on our site does not apply
  • Underpaying risks back wages and debarment

More from L&I: how rates, posting and records work

This section is general education from public sources and describes the law, not any one contractor’s practice.

L&I’s FAQs explain that the public body requests the rates for a project. If the contract is not awarded within 120 days of the determination date, a new request is needed. The rates should appear in the bid specifications and be incorporated into the contract, and a challenge to a determination must be filed within 10 days of the specifications being published and issued. A rate may include both cash pay and fringe benefits. Contractors must pay the full rate in cash or take credit for bona fide fringe contributions or authorized deductions.

Contractors and subcontractors must post the rates in an accessible location for the entire construction period, and the public body must enforce the posting requirement. Required payroll records include worker names, classifications, daily hours, hourly rates with benefits, deductions, fringe benefit records and timecards, kept at least 2 years and available to L&I and the public body. For apprentices, contractors must keep signed indentures, and apprentices must be approved by the Pennsylvania Apprenticeship and Training Council. L&I gives paying a lower rate under an unregistered training program as an example of an intentional violation.

What counts as maintenance, which is excluded

L&I says maintenance work is excluded. It defines maintenance as repairing existing facilities without changing their size, type or extent. Reconstruction and in-kind replacement are not maintenance and require prevailing wages. L&I’s examples include in-kind sidewalk replacement, roof replacement, road milling and replacement, and painting beyond covering minor imperfections.

The federal version: Davis-Bacon

Federal projects have their own law. The US Department of Labor says the Davis-Bacon Act applies to contracts in excess of $2,000 for the construction, alteration or repair of public buildings or public works, and that contractors must pay laborers and mechanics at least the locally prevailing wages and fringe benefits as determined by the Department of Labor. The Acts cover contractors and subcontractors, and the Related Acts extend them to federally assisted projects funded through grants, loans, loan guarantees and insurance. For prime contracts over $100,000, workers must receive one and one-half times their regular rate for hours over 40 in a workweek under the Contract Work Hours and Safety Standards Act.

Additional sources: Pennsylvania L&I Prevailing Wage FAQs (pa.gov/agencies/dli), US Department of Labor Wage and Hour Division, Davis-Bacon and Related Acts (dol.gov). Checked Nov 23, 2026. General information, not legal advice.

Questions

At what dollar amount does PA prevailing wage apply?

Public works projects with an estimated cost over $25,000, per L&I. Locally funded highway and bridge work contracted after January 1, 2014 uses $100,000.

Does private work ever trigger it?

It can. L&I says any public financing in whole or in part can trigger the requirement, including for private developers.

Where do I find the wage rates?

L&I posts rates on its Prevailing Wage page, and they should appear in the bid specifications.

Is maintenance work covered by PA prevailing wage?

No. L&I excludes maintenance, defined as repairing existing facilities without changing their size, type or extent. In-kind replacement and reconstruction are not maintenance.

Is there a federal prevailing wage law?

Yes. The Davis-Bacon Act applies to federal construction contracts in excess of $2,000 and to federally assisted projects under the Related Acts, according to the US Department of Labor.