Slope Ground Away From a Foundation: How to Regrade

To slope ground away from a foundation, build the soil up so it falls at least 6 inches in the first 10 feet from the wall, which is a 5 percent grade. That is the minimum final grade that the International Code Council’s Technical Note TN04 says building codes require, and K-State Extension uses the same 6-inches-in-10-feet figure. Hard surfaces such as patios, walks and driveways within 10 feet of the house get a lighter 2 percent minimum. Where the lot will not allow that slope, the sources accept swales or drains instead.

The grade is only half the job. Fill next to a foundation settles if it is not compacted, and settled fill turns a good slope back into a bowl against the wall. This guide gives you the target numbers, a stake-and-string chart you can use on the ground, the regrading steps, and the point where regrading stops being the answer.

How much slope away from the foundation: what the sources say

SourceRule for ground next to the houseAs a drop over 10 ft (calculated)
ICC Technical Note TN04 (cites 2015 IRC R401.3 for the 2% rule)5%, a 6 in. drop within the first 10 ft, or drains or swales that carry water away from the foundation. Impervious surfaces: 2% within 10 ft.6 in. for soil; 2.4 in. for slabs, walks and driveways
PNNL Building America Solution CenterHard surfaces: 2% for 10 ft or to the edge of the surface, whichever is less. Where barriers prevent a 6 in. drop in 10 ft, use drains or swales.2.4 in. for hard surfaces
K-State Research and Extension (MF2809)About 1 in. per ft for 15 ft is ideal; add soil until the grade drops at least 6 in. over 10 ft.6 in. minimum; 15 in. over 15 ft at the ideal
University of Minnesota ExtensionA minimum of 1 in. per ft for at least 6 ft.6 in. in the first 6 ft (about 8.3%)
University of Illinois ExtensionA minimum of 4% final grade around the foundation.4.8 in.
The sources do not agree exactly. K-State and the University of Minnesota ask for more fall near the wall than the 5% figure, while Illinois’s 4% is lower, so follow the code edition your township enforces. Last column is calculated from each rule.
Ground sloping away from a foundation: 6 inches in 10 feetSide-view diagram, vertical scale exaggerated. A foundation wall stands at the left. A dashed level line runs out from the top of the soil at the wall. The finished ground drops away from the wall so that 10 feet from the wall it is 6 inches lower than the level line, a 5 percent grade. Arrows show rain running away from the house.Foundation wall10 ft from the wall6 in.Level line at the top of the soil at the wallRain runs away from the houseVertical scale exaggerated. 6 in. in 10 ft = 5%.
The minimum code grade away from a foundation. The vertical scale is exaggerated so the drop is visible.

Stake chart: how far the ground should drop at each distance

Distance from the wallSoil at 5% (minimum drop below the level line)Slab, walk or drive at 2% (minimum drop)
2 ft1.2 in.0.5 in.
4 ft2.4 in.1.0 in.
6 ft3.6 in.1.4 in.
8 ft4.8 in.1.9 in.
10 ft6.0 in.2.4 in.
Calculated from the 5% and 2% grades in ICC TN04: drop = distance in inches × the percent. Mark each distance on a string line stretched level from the top of the soil at the wall, then measure down to the ground.

How to regrade next to a house, step by step

  1. Call 811 first. Pennsylvania’s PUC says homeowners and contractors must call 811 at least three business days before any digging or excavation. Regrading often means pulling sod and moving soil near buried lines, so make the call before the shovel goes in.
  2. Measure what you have. Stretch a string level from the top of the soil at the wall and measure down at 2, 4, 6, 8 and 10 feet, using the stake chart above. Any spot where the ground is higher than the chart, or rises back toward the house, is a problem spot.
  3. Strip the sod and loosen the surface where you are adding fill so the new soil sits on bare, loosened ground. This is common field practice rather than a rule from the sources above.
  4. Add fill in thin layers and compact each one. PNNL’s guide says to mechanically compact backfill to prevent later settling, with tamping as the stated method. The University of Minnesota notes that backfill next to the house is often placed without proper compaction and later settles. University of Illinois Extension says a hand tamp compacts 1 to 2 inches of lift at a time and a vibratory plate compactor or rammer 4 to 6 inches, and to check the equipment maker’s recommendation.
  5. Cap the grade. PNNL’s guide cites a 2 to 4 inch cap of silty clay on the top layer of grade. For the final lawn or bed finish on your site, ask a design professional or your supplier what to put on top.
  6. Check the slope and plan for settling. Re-measure against the chart. PNNL describes two routes: compact the backfill, or schedule in-fill and final grading after settling has occurred, such as after the first rainy season.
  7. Send roof water away too. The University of Minnesota says to extend downspouts so water discharges at least 4 feet beyond the wall, and ICC TN04 cites at least 5 feet for roof drainage where the soil is expansive or collapsible (IRC R801.3). Our guide on how far downspouts should extend covers the options.
Bare ground and broken concrete pieces beside the foundation of a sided house, with a crawlspace opening under a sliding door
Ground along a house foundation, with a crawlspace opening below the siding.

When you can’t get 10 feet of slope

Lot lines, a retaining wall, a driveway or a neighbor’s grade can leave you with less than 10 feet to work with. The code answer is drains or swales that carry water away from the foundation, and PNNL says the same where setbacks leave less than 10 feet or walls and slopes block the grade. Which one fits depends on where the water can go; our comparison of a swale vs. a French drain walks through it, and do I need a French drain covers when a pipe is worth it.

Existing slabs are a special case. PNNL notes that once concrete is poured, regrading is costly, and that drains at the base of a sloped driveway or patio, or pervious paving, are the alternatives. If water pools against a patio, see our patio slope guide.

When regrading is not the fix

Grading handles surface water. It does nothing for groundwater rising from below, a spring, or a basement leaking through a crack. If the yard stays wet away from the house, start with why your yard holds water after it rains; if the problem is inside, see wet basement in central PA. For lot-wide grading, our overview of land grading in central PA goes further.

Which code edition applies to your property, and whether a regrade near the foundation needs a permit or inspection, is a question for your local code office. We check with the local code office before setting footings and pouring, and it is a sensible call for a regrade too. For how close soil can sit to siding or wood framing, see the siding manufacturer’s installation guide.

Frequently Asked Questions

How much should ground slope away from a house?

ICC Technical Note TN04, written around the 2015 IRC, says building codes require a minimum final grade of 5 percent, a 6 inch drop within the first 10 feet, or drains or swales that carry water away. Slabs, walks and driveways within 10 feet need 2 percent. Some extension guides ask for more near the wall, such as the University of Minnesota’s minimum of 1 inch per foot for at least 6 feet. Check the code edition with your local code office.

What if I can’t slope 10 feet away from the house?

Use a swale or a drain instead. ICC TN04 allows drains or swales in place of the grade requirement, and PNNL says to install swales or perimeter drains where setbacks leave less than 10 feet or walls, slopes or other barriers block the slope.

What kind of soil should I use to regrade around a foundation?

PNNL’s guide describes capping the top layer of grade with 2 to 4 inches of silty clay and compacting backfill mechanically so it does not settle later. The University of Minnesota notes that uncompacted backfill next to a house often settles. For the final finish layer on your lawn or bed, ask your supplier or a design professional.

Why does the soil next to my foundation keep sinking?

Backfill placed without proper compaction settles over time, according to the University of Minnesota. PNNL recommends compacting fill by tamping, or scheduling the final grading after settling has occurred, such as after the first rainy season.

How far should downspouts discharge from the foundation?

The University of Minnesota says to extend downspouts so water discharges at least 4 feet beyond the wall. ICC Technical Note TN04 cites at least 5 feet for roof drainage where the soil is expansive or collapsible (IRC R801.3). Check your local code office for the distance that applies to your site.

Sources: ICC Technical Note TN04, Rain and Groundwater Management (5% final grade, 2% hard-surface grade and 5 ft roof drainage; cites 2015 IRC R401.3 and R801.3); PNNL Building America Solution Center, Final Grade Slopes Away From Foundation; PNNL, Patio Slabs, Porch Slabs, Walks and Driveways Slope Away From House; K-State Research and Extension, Dry Basements and Crawl Spaces (MF2809); University of Minnesota Extension, Moisture in basements; University of Illinois Extension, Landscape Drainage for Homeowners; Pennsylvania PUC, PA One Call (811). Stake-chart values are calculated from the percent grades.

Published by Muthler Landscaping & Construction, owned by Thayne Muthler (PA HIC #PA212584). How we research and check facts: editorial policy.