Slope Ratio Chart: Percent, Degrees and Inches per Foot
This slope ratio chart converts the ratios used on grading plans and in the field (2:1, 3:1, 4:1 and so on) into percent, degrees and inches of rise per foot. The short version: a 3:1 slope is 33.3 percent, about 18.4 degrees, or 4 inches of rise for every foot of run. Percent and degrees are not the same thing, and the ratio is written horizontal-to-vertical, so a bigger first number means a flatter slope.
Every figure in the conversion table below is calculated from the ratio, and the thresholds in the second table come from the sources listed at the end. If you would rather type in your own numbers, use the slope calculator; this page is the reference chart to keep open next to it.
Slope ratio chart: ratio, percent, degrees and inches per foot
| Ratio (H:V) | Percent | Degrees | Rise per 1 ft of run | Rise per 10 ft of run |
|---|---|---|---|---|
| 1:1 | 100% | 45.0° | 12 in. | 10 ft |
| 1.5:1 | 66.7% | 33.7° | 8 in. | 6.7 ft |
| 2:1 | 50% | 26.6° | 6 in. | 5 ft |
| 3:1 | 33.3% | 18.4° | 4 in. | 3.3 ft |
| 4:1 | 25% | 14.0° | 3 in. | 2.5 ft |
| 5:1 | 20% | 11.3° | 2.4 in. | 2 ft |
| 6:1 | 16.7% | 9.5° | 2 in. | 20 in. |
| 8:1 | 12.5% | 7.1° | 1.5 in. | 15 in. |
| 10:1 | 10% | 5.7° | 1.2 in. | 12 in. |
| 12:1 | 8.3% | 4.8° | 1 in. | 10 in. |
| 20:1 | 5% | 2.9° | 0.6 in. | 6 in. |
| 50:1 | 2% | 1.1° | 0.24 in. (about 1/4 in.) | 2.4 in. |
How to convert any slope
You only need rise and run, measured in the same units. These formulas are standard trigonometry, and the chart above was built with them.
- Ratio to percent: divide 100 by the first number. A 4:1 slope is 100 ÷ 4 = 25 percent.
- Percent to inches per foot: multiply the percent by 0.12. A 5 percent slope is 0.6 inch per foot, or 6 inches over 10 feet.
- Percent to degrees: take the inverse tangent (arctan, the tan⁻¹ key on a calculator) of the percent divided by 100. 33.3 percent gives about 18.4 degrees.
- Percent is not degrees: 100 percent is a 45-degree slope, not a 90-degree wall. A vertical face has no run, so its percent grade is infinite.
One notation trap: earthwork ratios are written horizontal-to-vertical, so 3:1 means 3 feet of run for every 1 foot of rise. Some calculators, including parts of our slope calculator, write the same slope as 1:3, rise first. Check which order a plan or a tool is using before you stake anything out.
Where the ratio actually matters
The conversion is math. What the number means for your yard comes from a handful of published thresholds. Some are guidance for finished slopes (mowing, erosion control, drainage) and some are workplace safety limits for open excavations, so read the last column before you borrow a number.
| Slope | What the source says | Source and scope |
|---|---|---|
| 2% (1/4 in. per ft) | Minimum grade for patio slabs, walks and driveways within 10 ft of the foundation. | ICC Technical Note TN04, citing the 2015 IRC. Check the code edition your township enforces. |
| 5% (6 in. in 10 ft) | Minimum final grade away from the foundation (a 6 in. drop within the first 10 ft), or sufficient drains or swales to carry water away. | ICC TN04, which says building codes require this. The Tech Note cites 2015 IRC R401.3 for the 2% rule above, not for this line; check the code edition your township enforces. |
| Flatter than 4:1 | Erosion control blankets are typically used for temporary vegetation support on slopes less than 4:1. | Minnesota Pollution Control Agency stormwater manual. |
| 3:1 or steeper | Avoid mowing “whenever possible”; mowing steep slopes increases compaction, causes slope failure and rutting, and decreases the vigor of the vegetation. | TxDOT roadside vegetation manual. A highway agency’s guidance, not a mower maker’s limit; see your mower’s manual for its own slope rating. |
| Steeper than 3:1 | Erosion control blankets or turf reinforcement mats are needed on most slopes steeper than 3:1. | Kentucky Energy and Environment Cabinet slope protection sheet. |
| Single-net blanket: to 3:1; double-net: to 2:1 | Maximum gradient ratings for standard blanket categories; check the maker’s spec for the product you buy. | Minnesota Pollution Control Agency, citing ECTC categories. |
| Type A soil: 3/4:1; Type B: 1:1; Type C: 1 1/2:1 | Maximum allowable slopes for sloped excavation walls (Type A has a steeper allowance, 1/2:1, for short-term cuts of 12 ft or less). Excavations deeper than 20 ft need a registered professional engineer’s design. | OSHA 29 CFR 1926 Subpart P, Appendix B. Workplace excavation rule, not a landscape design target. |
What the common ratios mean in a yard
Flat and nearly flat (50:1 to 20:1, 2 to 5 percent) is drainage territory. This is the range for paths, patios and the first 10 feet next to a house. Our patio slope guide covers how much fall a paver patio needs and which direction it goes.
Gentle lawn slopes (12:1 to 4:1, about 8 to 25 percent) are where most yards live. They are easy to walk, but water moves faster the steeper a bank gets, so bare soil on a slope can wash out before grass fills in. Per the Minnesota guidance above, erosion blankets are typically used on slopes flatter than 4:1 for temporary vegetation support.
Around 3:1 is where the published guidance changes. TxDOT says to avoid mowing, and Kentucky says most slopes steeper than 3:1 need a blanket or turf reinforcement mat. For extremely steep slopes, the Kentucky Energy and Environment Cabinet points to retaining walls or stair-step benches to shorten the slope. Ideas for working a slope into a design are in sloped backyard ideas, and a wall that holds a slope needs its own drainage, covered in retaining wall drainage.

Measuring the slope you already have
Drive a stake at the top of the slope and another at the bottom, string a line between them, and hang a line level on the string. Measure the horizontal distance between the stakes and the vertical distance from the string down to the ground at the lower stake. Divide the first by the second for your ratio, or the second by the first, times 100, for percent. For site-wide grading questions, such as how much fall a whole lot needs, see our overview of land grading in central PA.
Frequently Asked Questions
What is a 3:1 slope in percent and degrees?
A 3:1 slope (3 feet of run for every 1 foot of rise) is 33.3 percent, about 18.4 degrees, or 4 inches of rise per foot of run. These values are calculated from the ratio. The Kentucky Energy and Environment Cabinet’s conversion table lists the same slope as 33 percent and 18 degrees.
Is a 100 percent slope 90 degrees?
No. A 100 percent slope rises 1 foot for every 1 foot of run, which is 45 degrees (a 1:1 slope). A true 90-degree face has no horizontal run, so its percent grade is infinite.
How do I convert a percent slope to inches per foot?
Multiply the percent by 0.12. A 5 percent slope is 0.6 inch of fall per foot, or 6 inches over 10 feet, the minimum final grade next to a foundation that ICC Technical Note TN04 gives. A 2 percent slope is about a quarter inch per foot.
How steep is too steep to mow?
TxDOT’s roadside vegetation manual says to avoid mowing slopes of 3:1 or steeper whenever possible, because it increases compaction, causes slope failure and rutting, and weakens the vegetation. That is a highway-maintenance guideline. For a specific mower, follow the slope rating in the manufacturer’s manual.
What slope needs an erosion control blanket?
The Kentucky Energy and Environment Cabinet says blankets or turf reinforcement mats are needed on most slopes steeper than 3:1. Minnesota’s stormwater manual notes that single-net blankets are rated to 3:1 and double-net blankets to 2:1, and that you should check the maker’s specification for the slope you have.
Sources: ICC Technical Note TN04, Rain and Groundwater Management (5% final grade and 2% hard-surface grade; the Tech Note cites 2015 IRC R401.3 for the 2% rule); Kentucky Energy and Environment Cabinet, Protect Slopes (conversion table, blankets steeper than 3:1); Minnesota Pollution Control Agency, erosion control blankets and anchoring devices; TxDOT, Avoid Mowing Steep Slopes; OSHA, 29 CFR 1926 Subpart P Appendix B, Sloping and Benching. Conversions in the chart are calculated from the ratio.
Published by Muthler Landscaping & Construction, owned by Thayne Muthler (PA HIC #PA212584). How we research and check facts: editorial policy.