Slope erosion control: what will hold your hillside

What holds a bank depends on how steep it is. Straw works on gentle ground, blankets take over around 3:1, and past 2:1 you’re regrading or building walls. Enter the rise and run of your slope and see which fix fits, using Pennsylvania DEP’s erosion control standards.

Quick answer

Under 8%: seed and straw. 8% up to 3:1: hold the mulch with netting or a blanket; still mowable. 3:1 to 2:1: erosion control blanket and plants you don’t mow. Steeper than 2:1: lay it back or terrace it with walls. Near a stream, blanket anything you seed. Checked Nov. 13, 2026.

Slope erosion control tool

Run a level string out from the top of the bank and measure its length (run) and the drop to the ground at the end (rise). Or use our slope calculator.

Best fit—Enter the rise and the run
Slope face areaWhat a blanket or seed has to cover—

    From the PA DEP erosion control manual, Texas DOT’s mowing standard and Minnesota DNR. A guide for yards and banks, not an engineered slope design.

    Fixes by steepness

    SlopeWhat holds itMow it?Source
    Under 8%Seed and straw mulchYesDEP p. 271
    8% to just under 3:1 (33%)Seed with mulch held by netting, or a blanket; wood fiber hydromulch needs a tackifierYesDEP p. 271, TxDOT
    3:1 to 2:1 (33% to 50%)Erosion control blanket over seed; groundcovers, native grasses or shrubsAvoidDEP p. 273, TxDOT
    Steeper than 2:1 (over 50%)Lay it back, or terrace with retaining wallsNoMinnesota DNR

    Slopes are written horizontal to vertical: 3:1 means 3 ft out for every 1 ft up, a 33% grade or about 18°. 2:1 is 50%, about 27°.

    Get it to take

    Water first

    If runoff from the yard, a roof or the road pours over the top, route it around the bank with a swale or pipe before you seed.

    Topsoil

    At least 4 in. of topsoil on areas to be seeded (DEP standard notes).

    Don’t till a steep bank

    To swap lawn for groundcover, kill the turf and plant into the dead sod (Minnesota DNR).

    Plant for the slope

    Native groundcovers help, and taller native perennials, shrubs and trees do an outstanding job holding soil on a slope. On steep ground you can plant through natural fiber netting (Penn State Extension).

    Disturbing 5,000 sq ft or more brings in DEP’s written erosion control plan; see do I need a stormwater plan?

    Questions

    When do you need an erosion control blanket on a slope?

    Pennsylvania DEP’s erosion control manual says blankets should be used on all slopes 3H:1V or steeper where sediment could reach a stream, pond or wetland, and on all seeded areas within 50 ft of a surface water (100 ft of a special protection water) no matter how flat. It also suggests blankets where poor soil makes grass hard to start.

    Will straw hold on a slope?

    On gentle ground, yes. DEP says mulch on slopes of 8% or steeper should be held in place with netting, and wood fiber hydromulch needs a tackifier on steeper slopes.

    What slope is too steep to mow?

    Texas DOT’s roadside manual says to avoid mowing slopes 3:1 or steeper whenever possible. At that point plan on groundcovers, native grasses or shrubs instead of lawn.

    What if my bank is steeper than 2:1?

    Minnesota DNR notes vegetation is difficult to establish on slopes steeper than 2:1, and a bare slope may need regrading to be stable. The usual fixes are laying the slope back if there’s room, or terracing it with retaining walls.

    When is a slope considered stabilized?

    Pennsylvania’s standard is a uniform, perennial 70% vegetative cover, or a non-vegetative cover dense enough to resist erosion.

    Sources: PA DEP, Erosion and Sediment Pollution Control Program Manual, 386-2134-001 (March 31, 2012): mulch netting at 8% (p. 271); erosion control blankets at 3H:1V and within 50 ft of water (p. 273); 4 in. topsoil and 70% perennial cover (pp. 396 to 397); Texas DOT, Roadside Vegetation Management Manual, Avoid Mowing Steep Slopes (3:1 or steeper); Minnesota DNR, Site Challenges: Steep Slopes (vegetation is difficult to establish steeper than 2:1); Penn State Extension, Native Groundcovers Can Solve Tough Challenges in the Landscape (updated Aug. 23, 2024). Checked Nov. 13, 2026.

    Muthler Landscaping & Construction · Lock Haven, PA

    Bank washing out?

    We regrade slopes, build retaining walls and fix the drainage behind them across central PA.

    Get a quoteDrainage guide

    Also: slope calculator, retaining wall block calculator, retaining wall permits, steps on a slope calculator.

    Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.