Enter your ZIP code. The tool looks at the next 24 hours of air temperature, soil temperature, rain and wind, then gives you a green, yellow or red call for placing concrete, with the numbers behind it and the next seven days.
This is a planning check built from a weather model and published cold-weather and hot-weather concrete guidance (ACI 306 and 305). It does not replace your ready-mix supplier, your engineer or a probe bar in the actual subgrade.
Something went wrong.
Colors: green means go, yellow means pour only with precautions, red means do not pour in this window. The 40°F cold-weather line and the frozen-subgrade rule come from ACI 306. The 32°F, 90°F, rain and wind cutoffs are our own rules of thumb.
Forecast data by Open-Meteo.com (CC BY 4.0). ZIP lookup by Zippopotam.us. Your ZIP code goes to those two services to get the forecast. We do not store it.
Next 7 days
What the numbers mean
The verdict covers the next 24 hours, not just the moment the truck shows up. That is the stretch that decides whether a slab turns out right. ACI 306, the cold-weather guide most specs lean on, treats it as cold weather when the air has fallen, or is expected to fall, below 40°F during the protection period. Its guidance is to protect concrete surfaces from freezing for at least the first 24 hours after placement. Below 32°F, we stop calling it a regular pour.
Frozen ground is the other problem. The NRCS summary of ACI 306 says concrete is not placed on frozen subgrade, though it can sometimes be thawed with insulation for a few days first. We flag red when the soil 6 cm down is at or below 32°F. That number is a model estimate, so push a probe bar into the base and look before you commit a crew and a truck.
Heat counts too. ACI 305 describes hot weather by conditions: high air and concrete temperature, low humidity and wind. In the part of the guide we could read, it does not hand you one number, so the 90°F flag here is our own rule of thumb, and so are the rain and wind cutoffs.
Mistakes we see
Checking the temperature at pour time and ignoring the overnight low. Pouring on a base that is thawed on top and frozen underneath. Skipping the blankets because the forecast low is 36°F. Forgetting rain timing: a short shower an hour after you strike off will ruin a broom finish. Ordering concrete before you have checked any of this.
Central PA specifics
Late fall and early spring around Lock Haven can give you a 45°F afternoon and a hard freeze that night, which is exactly when people get burned. Valley mornings and shaded north sides of a house stay cold longer than the town forecast suggests. If your pour is close to the line, move it a day. See our guide on how cold is too cold to pour concrete for blankets and cure times.
Questions
What temperature is too cold to pour concrete?
ACI 306 treats conditions as cold weather once the air is at or below 40°F, or expected to fall below it, during the protection period. You can still place concrete in that range if you protect it. Fresh concrete that freezes before it gains strength can be badly damaged, so below 32°F you need a full cold-weather plan.
Can you pour concrete on frozen ground?
No. The NRCS summary of ACI 306 says concrete will not be placed on frozen subgrade. Sometimes the subgrade can be thawed by covering it with insulating material for a few days before placement.
Can you pour concrete in the rain?
We avoid it. Rain during finishing washes cement paste from the surface and leaves a weak, scaly top. A light shower hours before a pour is a different story if the forms are drained and the base is not soupy.
How accurate is this check?
It uses a public weather model, including modeled soil temperature. Forecasts miss, and ground temperature varies by shade, moisture and snow cover. Use it to plan, then confirm with your supplier and the real conditions on site.
How we decide: ACI 306R-16, Guide to Cold Weather Concreting (preview) (cold weather = air at or below 40°F or expected to fall below it during the protection period; protect surfaces from freezing at least the first 24 hours); NRCS fact sheet, Cold Weather Concreting (summary of ACI 306R-88) (no placement on frozen subgrade); ACI 305R-20, Guide to Hot Weather Concreting (preview) (hot weather defined by high temperature, low humidity and wind); Open-Meteo forecast API (hourly air temperature, precipitation, wind and modeled soil temperature). Weather data by Open-Meteo.com. Checked Nov. 22, 2026.
More from Muthler
All five live checks in one place.
Soil temperature check before you dig.
Keep ice off walks and drives.
Related guide
Related guide
Muthler Landscaping & Construction · Lock Haven, PA
Need concrete poured right?
We place flatwork, pads and footings across Clinton, Centre, Lycoming and Union counties, and we move the date when the weather says to. Send us the job and we will tell you what it takes.
Get a quoteAll live checksMuthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.