Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

GROUNDWORK DESIGN CO. / FOR CONTRACTORS

Retaining wall design for contractors

Wall layout sheets you can bid and build from: plan, front elevation and typical section, with real block courses, base, drainage and block counts. Under your logo, from a company that builds walls every season.

Open a contractor accountSee a real wall plan
SHEETW-1 Wall layout
INCLUDESPlan · Elevation · Section
TURNAROUND7 business days
ADD-ON+$250 per plan
Your logo
01 / TYPICAL SECTION
1 2 3 4 5 6 7 NOT TO SCALE

What every wall sheet decides

  1. Compacted crushed-stone leveling pad, sized to the wall height.
  2. First course buried, so the wall starts below finished grade.
  3. Clean drainage stone behind the block, no fines.
  4. Perforated pipe at the base with an outlet to daylight.
  5. Geogrid layers flagged where height or load calls for it. Final lengths come from the engineer.
  6. Cap course, with the batter of the block system.
  7. Setback per course, so the wall leans back on purpose.
02 / WHAT YOU GET
ViewShowsWhy it helps you bid
PlanWall line, returns, steps in the top, curves, tie-ins to patios and stairsLinear feet and layout locked before you price it
Front elevationEvery course, where the base steps up, cap line, exposed height along the wallBlock and cap counts you can hand your supplier
Typical sectionPad, buried course, drain stone, pipe, grid flags, backfill, finished gradesBase tons, stone tons and pipe length in the takeoff
TakeoffBlock, caps, base stone, drain stone, pipe, fabric where used, grid if flaggedYour estimate starts half done
We flag what needs an engineer.

Walls over 4 ft, walls holding up a driveway or parking area, tiered walls too close together, and walls on poor soil get flagged on the sheet so you can price engineering and permits in before you bid. We’re designers, not engineers, and our sheets aren’t sealed.

03 / PRICING
OrderPay per planMonthly plan
Single area plan + wall layout sheet$295 + $250$279 + $250
Full yard plan + wall layout sheet$750 + $250$715 + $250
Rush (5 business days)+$150

No retainer on per-plan orders. The monthly plan is at least one plan a month with a 3-month minimum. Draw with the block system you install: tell us the brand and unit and the courses match your order.

Open a contractor accountHow white-label works
FIELD REFERENCE / WHAT THE SHEET MUST ANSWER

What a wall sheet needs before you can bid or build it

A wall sheet is only useful if a crew can stake it, dig it and order it without calling you. That means every number the block manufacturer’s manual asks for is on the page, and anything the manual says is outside its tables is flagged for an engineer. The figures below are the published starting points from Allan Block, Versa-Lok and the Concrete Masonry & Hardscapes Association (CMHA). Your block system’s own manual governs, and so does your town’s code.

Item on the sheetPublished starting pointWhat we put on the drawing
Leveling padAllan Block: 6 in. deep by 24 in. wide, or 12 in. wider than the block depth, is the typical minimum base.Pad depth and width in the section; pad elevation and every step in the elevation.
Buried blockAllan Block: at least 6 in., or 1 in. per foot of wall height. Versa-Lok rule of thumb: 6 in. minimum with a level toe, wall height ÷ 7 with a sloped toe.Buried course(s) shown below finished grade in the section.
Setback / batterSet by the block unit and its connection, so it changes from system to system.The system’s setback per course, drawn so the top of wall lands where the plan says.
Wall rock (drainage aggregate)Allan Block: a 12 in. column behind the block, 0.25 to 1.5 in. aggregate with less than 10% fines.Stone zone width and spec called out, so it goes on the takeoff in tons.
Drain pipeAllan Block: pipe at the back of the trench the length of the wall, vented to daylight or a storm sewer.Perforated pipe at the base with its outlet to daylight.
GeogridAllan Block: typically a minimum of 60% of total wall height. Versa-Lok rule of thumb: 60% of height with level backfill, a length equal to the wall height with sloped backfill.Grid layers flagged where height or load calls for them. Final lengths come from the engineer.

When the tables stop and the engineer starts

Manufacturer grid charts are estimating tools. Allan Block’s geogrid charts say plainly that they are “for material estimates only” and that final designs for construction “must be performed by a local registered Professional Engineer.” Versa-Lok’s rule-of-thumb sheet says that, generally, any wall over 4 ft high should be engineered. CMHA notes that unreinforced (gravity) walls typically top out around 3 to 4 ft, and less with poor soil or a surcharge.

The model residential code draws a similar line. Section R404.4 of the International Residential Code (IRC) says a retaining wall that is not braced at the top and retains more than 48 in. of unbalanced fill, or one over 24 in. that resists lateral loads besides soil, shall be designed in accordance with accepted engineering practice, with a safety factor of 1.5 against sliding and overturning. Pennsylvania towns adopt and amend codes on their own, so check the local rule. Our retaining wall base guide and batter guide go deeper on base and setback.

Sheet checklist before you send the bid

  1. Wall height measured the way the manufacturer measures it. CMHA measures from the top of the leveling pad to the top of the top unit, cap excluded.
  2. Pad depth, pad width and buried depth on the section.
  3. Setback per course matching the exact unit you are ordering.
  4. Wall rock zone and drain pipe outlets shown, not just “drainage.”
  5. Anything above the wall within reach of it: slope, patio, driveway, fence, pool.
  6. Terraces checked: CMHA treats tiers as independent only when they are at least twice the lower wall’s height apart.
  7. Grid labeled preliminary, and an engineer flag on anything past the tables.
  8. Construction notes the crew will need: Allan Block keeps heavy equipment at least 3 ft from the back of the wall and compacts in lifts of 8 in. or less.

Sources: Allan Block, Chapter 2 Typical Retaining Wall Construction (allanblock.com/docs/Best_Practices/2-typical-wall-construction.html); Allan Block, Reinforced Wall Construction (allanblock.com/installation/commercial-installation/reinforced-wall-construction); Allan Block, Reinforced Soil Walls (allanblock.com/installation/commercial-installation/reinforced-soil-walls); Allan Block, Geogrid Estimating Charts (allanblock.com/docs/Commercial_Installation_Manual/geogrid-reinforcement-estimating-charts.html); Allan Block, Proper Embedment Guidelines (allanblock.com/resources/articles/proper-embedment-guidelines); Versa-Lok Rule of Thumb Guidelines (canadabrick.com); CMHA SRW FAQ 001 (cmha.org/resource/srw-faq-001/); IRC R404.4, text as printed in the 2025 California Residential Code (gocodebook.com) and the 2021 IRC as quoted by the City of Grand Prairie, TX (gptx.org).

04 / QUESTIONS
Which wall systems do you draw?

Any segmental block system you buy. Name the brand and unit and we draw to its course height, setback and cap. Natural stone and boulder walls are drawn as layout and section with typical details.

Can you design terraced walls?

Yes. We set tier spacing so each wall stands on its own, and flag spacing that would load the lower wall. Our guide to terraced backyard tier math shows the rule we start from.

Will the sheet get me a permit?

Sometimes it’s enough for a small wall; often a permit needs a stamped design. Check with your local building department. Read retaining wall permits for how it usually works.

What do you need from me?

Photos, the wall line and length, rough heights at a few points, what sits above the wall (lawn, patio, driveway) and the block you install. Upload it all in the contractor portal.

How long does geogrid need to be on a block wall?

Manufacturer rules of thumb start around 60% of the total wall height for level backfill. Versa-Lok’s guide calls for a length equal to the wall height when the backfill slopes. Those are estimating numbers; the final length comes from an engineer’s design.

How deep does the first course of a retaining wall need to be buried?

Allan Block calls for at least 6 in. of buried block, or 1 in. per foot of wall height. Versa-Lok’s rule of thumb is 6 in. with a level toe and wall height divided by 7 when the ground slopes away in front. Follow the manual for the block you install.

At what height does a retaining wall need an engineer?

Versa-Lok’s guide says, generally, any wall over 4 ft should be engineered, and IRC section R404.4 requires engineered design for a wall not braced at the top that holds more than 48 in. of unbalanced fill, or a wall over 24 in. that carries loads besides soil. Your town’s adopted code decides, and a shorter wall with a driveway or other load above it can need one too.

Groundwork Design Co. is the design studio of Muthler Landscaping & Construction LLC · Lock Haven, PA · (570) 397-9800 · PA HIC #PA212584. Sheets are design drawings, not engineered or sealed drawings. Related: retaining wall design guide · when walls need geogrid · wall block calculator · online retaining wall design for homeowners