Scaffold requirements on job sites: OSHA 1926.451

Quick answer: Section 1926.451 is OSHA’s general scaffold standard for construction. A scaffold and its components must hold their own weight plus at least 4 times the maximum intended load, a qualified person must design it, a competent person must inspect it before each workshift, and employees on a scaffold more than 10 feet above a lower level must be protected from falling. Aerial lifts are not covered here; they fall under 1926.453.

This page goes through 1926.451 paragraph by paragraph, as shown on Cornell’s Legal Information Institute. Check the current CFR text at ecfr.gov before relying on any number. For a plain-language overview of the whole subpart, see our scaffold and aerial lift basics page.

Capacity and design: paragraph (a)

Under (a)(1), scaffolds and components must support their own weight and at least 4 times the maximum intended load, with exceptions in (a)(2) to (a)(5) and (g). Roof and floor connections and counterweights for adjustable suspension scaffolds must resist at least 4 times the tipping moment at the hoist’s rated load, or at least 1.5 times the tipping moment at its stall load, whichever is greater. Each rope on a non-adjustable suspension scaffold, with its hardware, must support at least 6 times the maximum intended load. For adjustable suspension scaffolds the figure is 6 times the maximum intended load at the hoist’s rated load, or at least 2 times the stall load, whichever is greater. A hoist’s stall load may not exceed 3 times its rated load. Under (a)(6), a qualified person designs the scaffold, and it must be built and loaded to that design. Non-mandatory Appendix A gives compliance examples.

Platform construction: paragraph (b)

ItemRule
(b)(1) PlankingPlatforms fully planked between the front uprights and guardrail supports; gaps 1 inch or less, or up to 9 1/2 inches where the employer shows a wider gap is necessary
(b)(2) WidthAt least 18 inches; ladder jack, top plate bracket, roof bracket and pump jack scaffolds may be 12 inches; where too narrow, as wide as feasible with guardrails or personal fall arrest
(b)(3) Distance from workFront edge no more than 14 inches from the work face unless guardrails or fall arrest are used; 3 inches for outrigger scaffolds; 18 inches for plastering and lathing
(b)(4) Support lengthEach end extends at least 6 inches over its support centerline unless cleated or hooked
(b)(5) OverhangPlatforms 10 feet or shorter may overhang a support by no more than 12 inches; longer platforms no more than 18 inches, with exceptions
(b)(7) OverlapOverlap only over supports, at least 12 inches, unless nailed or restrained

Paragraph (b) also says abutted planks must each rest on a separate support, that wood platforms may not be covered with opaque finishes, and that components from different manufacturers may be mixed only if they fit without force and structural integrity is kept. Dissimilar metals may be combined only if a competent person determines galvanic action will not reduce strength below the (a)(1) level.

Supported scaffolds: paragraph (c)

A supported scaffold with a height-to-base ratio above 4:1, including outriggers, must be restrained from tipping by guys, ties, braces or equivalent means. The bracing pattern is detailed: start at the closest horizontal member to the 4:1 height, repeat vertically every 20 feet for scaffolds 3 feet wide or less or every 26 feet for wider scaffolds, and install at each end and at horizontal intervals of 30 feet or less. Poles, legs, posts, frames and uprights must bear on base plates and mud sills or other firm foundations, with footings level, sound, rigid and non-settling. Unstable objects may not support scaffolds. Front-end loaders may support platforms only if the manufacturer designed them for it, and forklifts only if the whole platform is attached to the forks and the forklift does not move horizontally while occupied. Supports must be plumb and braced against swaying. For a landscape crew building a wall or setting stone on uneven ground, the footing rule in (c)(2) is the one that usually matters.

Suspension scaffolds: paragraph (d)

Paragraph (d) is long and technical. It covers outrigger beams, counterweights, tiebacks, hoists and wire rope. We note only a few points: counterweights must be non-flowable, so sand and gravel are prohibited, and masonry units and roofing felt rolls may not be used as counterweights; repaired wire rope is prohibited as suspension rope; a competent person inspects ropes before each workshift; and gasoline-powered equipment and hoists are prohibited. Suspension scaffold work should be planned with the manufacturer and a qualified person, not from a summary page.

Access: paragraph (e)

When platforms are more than 2 feet above or below an access point, an approved means of access must be used, such as ladders, stair towers, ramps, walkways, integral access, direct access from another surface or a personnel hoist. Crossbraces are never access. Hook-on and attachable ladders need a bottom rung no more than 24 inches above the supporting level and rest platforms every 35 feet on supported scaffolds over 35 feet tall. Stair towers must have a bottom step no more than 24 inches above the supporting level, be at least 18 inches wide between stairrails, and be installed between 40 and 60 degrees from horizontal. Direct access to another surface is allowed only when the scaffold is no more than 14 inches horizontally and 24 inches vertically from it. Our ladder rules page covers ladders in general.

Use: paragraph (f)

  • Loads may not exceed the maximum intended load or rated capacity, whichever is less.
  • Shore and lean-to scaffolds are prohibited.
  • A competent person inspects before each workshift and after any event affecting structural integrity.
  • Scaffolds may not be moved horizontally with employees aboard, with limited exceptions.
  • Employees may not work on scaffolds covered in snow, ice or slippery material, except to remove it.
  • Work on scaffolds is prohibited during storms or high winds unless a competent person determines it is safe and employees are protected.
  • Debris may not accumulate on platforms, and makeshift devices such as boxes and barrels may not raise working height.
  • A loaded platform may not deflect more than 1/60 of the span.

Power line clearances in (f)(6) are 3 feet for insulated lines under 300 volts and 10 feet for insulated lines of 300 volts to 50 kV and for uninsulated lines under 50 kV. Higher voltages add 0.4 inches per kV over 50 kV or twice the insulator length, never under 10 feet. Closer approach needs the utility or system operator to be notified and to de-energize, relocate or cover the lines. See our power line clearance page.

Fall protection and falling objects: paragraphs (g) and (h)

Under (g)(1), employees on a scaffold more than 10 feet above a lower level must be protected, with the method depending on scaffold type. For example, boatswains’ chairs, catenary, float, needle beam and ladder jack scaffolds need a personal fall arrest system; single-point or two-point adjustable scaffolds need both a personal fall arrest system and a guardrail; and overhand bricklaying from supported scaffolds needs fall arrest or a guardrail on all open sides and ends except the wall side. Guardrails under (g)(4) must have a top edge 38 to 45 inches above the platform for supported scaffolds made or placed in service after January 1, 2000, with older supported scaffolds at 36 to 45 inches; midrails about midway; intermediate members no more than 19 inches apart; and toprails that withstand 100 pounds (single or two-point adjustable suspension scaffolds) or 200 pounds (all others). Steel or plastic banding may not be used as toprails or midrails. Fall arrest systems must meet 1926.502(d); see our fall protection criteria page.

For falling objects, (h) requires protection beyond hardhats, such as toeboards, screens, guardrails, debris nets, catch platforms or canopies. Where objects could fall on employees below, the employer must barricade the area, install toeboards on platforms more than 10 feet above lower levels, extend screening, use a guardrail with small openings, or erect a canopy, net or catch platform. Toeboards must withstand 50 pounds, be at least 3 1/2 inches high and have no more than 1/4 inch clearance above the working surface. See our head protection page.

Practical checklist before crews climb on

  • Confirm the footing: base plates, mud sills, level and non-settling ground.
  • Check planking, gaps and the 18-inch width, and verify the 4:1 tie rule if the scaffold is tall.
  • Install access so nobody climbs crossbraces.
  • Have a competent person inspect before the shift and tag the scaffold.
  • Install guardrails or fall arrest on every platform over 10 feet before releasing it to the crew.
  • Look up for power lines and down for people.
Planning information only. This page summarizes public regulation text and is not engineering or legal advice. Scaffold design needs a qualified person. Check the current CFR text before relying on any number here.

Sources

SourceUsed for
29 CFR 1926.451, General requirements (Cornell LII)All paragraphs summarized above

Checked Nov. 23, 2026. Check the current CFR text at ecfr.gov before relying on details.

Related

Scaffold and aerial lift basics · Fall protection duty · Ladders · All PA site work regulations

Talk to us about your project

FAQ

What load must a scaffold hold under 1926.451?

Paragraph (a)(1) says scaffolds and components must support their own weight and at least 4 times the maximum intended load, with listed exceptions for suspension scaffold ropes and connections.

At what height do scaffold workers need fall protection?

Paragraph (g)(1) requires protection for employees on a scaffold more than 10 feet above a lower level, with the method depending on the scaffold type.

How wide must a scaffold platform be?

Paragraph (b)(2) says at least 18 inches, with 12 inches allowed for ladder jack, top plate bracket, roof bracket and pump jack scaffolds, and as wide as feasible where space is too narrow.

Can workers climb the crossbraces to reach the platform?

No. Paragraph (e)(1) says crossbraces are never an approved means of access when platforms are more than 2 feet above or below an access point.