Rigging equipment and slings: OSHA 1926.251
Quick answer: Section 1926.251 is OSHA’s rule for rigging equipment used in material handling. Rigging must be inspected before each shift and as needed during use, defective gear must come out of service, every piece must carry a legible safe working load marking and never be loaded past it, and a competent person must inspect slings and their fastenings each day before use.
This page goes through 1926.251 paragraph by paragraph, as shown on OSHA’s website. Verify every number against the current CFR text at ecfr.gov before relying on it. For lifting with cranes, see our cranes and power line safety page, and for stacking and storing material, see our materials storage page.
General rules for all rigging: paragraph (a)
- (a)(1) Inspection: rigging equipment must be inspected before use on each shift and as needed during use. Defective equipment must be removed from service.
- (a)(2) Markings: the employer must make sure rigging equipment has permanently affixed, legible manufacturer markings showing the recommended safe working load, is not loaded beyond that marked load and is not used without the markings.
- (a)(3) Storage: rigging equipment not in use must be removed from the immediate work area so it does not present a hazard.
- (a)(4) Custom devices: special custom grabs, hooks, clamps or other lifting accessories, for items such as modular panels or prefabricated structures, must be marked with safe working loads and proof-tested to 125 percent of their rated load before use.
- (a)(5) Scope: the section covers slings used with other material handling equipment for hoisting. The covered types are alloy steel chain, wire rope, metal mesh, natural or synthetic fiber rope of conventional three-strand construction, and synthetic web made of nylon, polyester or polypropylene.
- (a)(6) Sling inspections: a competent person designated by the employer must inspect the sling and all fastenings and attachments each day before use, with more inspections during use when service conditions warrant. Damaged or defective slings must be removed from service immediately.
Alloy steel chain: paragraph (b)
Welded alloy steel chain slings must have permanent, durable markings stating size, grade, rated capacity and sling manufacturer. Hooks, rings, oblong links, pear-shaped links, coupling links and other attachments must have a rated capacity at least equal to the chain. Job or shop hooks, links or makeshift fasteners made from bolts, rods or similar materials are prohibited. If wear at any point of a chain link exceeds the value in Table H-1, the assembly must come out of service. That table runs from 3/64 inch for 1/4-inch chain to 11/32 inch for 1 3/4-inch chain.
Paragraph (b)(6) adds a thorough periodic inspection on top of the daily one. Its frequency depends on how often the sling is used, how severe the service is, the nature of the lifts and experience with similar slings, and inspections may not be more than 12 months apart. The employer must record the most recent month each chain sling was thoroughly inspected and make that record available for examination.
Wire rope: paragraph (c)
| Paragraph | Rule |
|---|---|
| (c)(1) | Loads must not exceed the working load limits marked on the sling |
| (c)(3) | Wire rope may not be secured by knots, except on haul-back lines on scrapers |
| (c)(4)(i) | Eye splices need at least three full tucks, unless another splice is shown to be equally efficient and is not otherwise prohibited |
| (c)(4)(iii) | Eyes in bridles, slings or bull wires may not be formed with wire rope clips or knots |
| (c)(4)(iv) | Rope is unusable if, within any length of eight diameters, visible broken wires exceed 10 percent of the total wires, or if it shows other excessive wear, corrosion or defects |
| (c)(6) and (c)(7) | Slings may not be shortened with knots, bolts or other makeshift devices, and sling legs may not be kinked |
| (c)(9) to (c)(12) | Pad slings against sharp load edges; keep hands and fingers out from between sling and load while tightening; no shock loading; do not pull a sling from under a load while the load rests on it |
| (c)(14) | Fiber-core wire rope slings exposed to temperatures above 200 degrees F must be permanently removed from service; nonfiber-core slings used above 400 degrees F or below minus 60 degrees F must follow the manufacturer’s temperature recommendations |
| (c)(16) | Slings must be permanently and legibly marked with size, rated capacity for each hitch type and its angle basis, and the number of legs if more than one |
Paragraph (c)(5) covers U-bolt clips used to form eyes. Table H-2 gives the number and minimum spacing of clips by rope diameter, from 1/2 inch to 1 1/2 inches, and gives separate figures for drop-forged clips and clips of other material. As an example from that table, 1-inch rope needs 5 drop-forged clips or 6 clips of other material, spaced at least 6 inches apart. For eye splices, the U-bolt must be applied so the U section contacts the dead end of the rope. Paragraph (c)(15) says welded end attachments may not be used unless proof-tested by the manufacturer or an equivalent entity to twice their rated capacity before initial use, and the employer must keep the proof-test certificate available for examination.
Natural and synthetic fiber rope: paragraph (d)
Loads must not exceed the working load limits marked on the sling, and splices must follow the rope manufacturer’s recommendations. Minimums in the section include at least 3 full tucks for manila eye splices and 4 for laid synthetic rope, with the included angle of any eye splice not above 60 degrees. Knots may not replace splices. Natural and synthetic fiber slings, except wet frozen slings, may be used between minus 20 degrees F and 180 degrees F without reducing the working load limit, and outside that range the manufacturer’s recommendations apply. Slings must be removed from service immediately if any of these show up:
- abnormal wear;
- powdered fiber between strands;
- broken or cut fibers;
- variations in strand size or roundness;
- discoloration or rotting;
- distorted hardware.
Synthetic webbing: paragraph (e)
Each webbing sling must be marked or coded with the manufacturer’s name or trademark, rated capacities for each hitch type and the material type, and the rated capacity may not be exceeded. Webbing must be uniform in thickness and width, and selvage edges may not be split from the webbing’s width. Stitching is the only permitted method of attaching end fittings or forming eyes. Environmental limits in (e)(6) say nylon slings may not be used where acid or phenolic fumes, vapors, sprays, mists or liquids are present, and polyester and polypropylene slings may not be used where caustic fumes, vapors, sprays, mists or liquids are present. Under (e)(7), polyester and nylon slings may not be used above 180 degrees F and polypropylene slings may not be used above 200 degrees F. Webbing slings must come out of service immediately for acid or caustic burns, melting or charring of any surface part, snags, punctures, tears or cuts, broken or worn stitches, or distorted fittings.
Shackles and hooks: paragraph (f)
Loads must not exceed the working load limits marked on a shackle. For hooks, the manufacturer’s recommendations are followed to determine safe working loads for specific, identifiable hooks. Hooks without applicable manufacturer recommendations must be tested to twice their intended safe working load before initial use, and the employer must keep a record of test dates and results.
Practical checklist
- Have the designated competent person look over each sling, fastening and attachment before the first lift of the day.
- Check that every sling has its legible capacity marking before it is used, and take out of service any that do not.
- Pull out any chain, wire rope, fiber rope or webbing sling that shows one of the defects listed above.
- Do not make up hooks, links or fasteners from bolts or rods.
- Keep a record of the month of each chain sling’s thorough inspection, and keep any proof-test certificates and hook test records.
- Move rigging not in use out of the immediate work area.
Sources
| Source | Used for |
|---|---|
| 29 CFR 1926.251, Rigging equipment for material handling (OSHA) | Paragraphs (a) through (f) and Tables H-1 and H-2 summarized above |
Checked Nov. 23, 2026. Check the current CFR text at ecfr.gov before relying on details.
Related
Cranes and power line safety · Materials storage · Struck-by hazards · All PA site work regulations
FAQ
How often must rigging equipment be inspected under 1926.251?
Paragraph (a)(1) says before use on each shift and as needed during use, and (a)(6) says a competent person must inspect slings and their fastenings and attachments each day before use.
Can I use a sling with no capacity marking?
Paragraph (a)(2) says rigging equipment must have legible manufacturer markings showing the recommended safe working load and may not be used without them.
When must a wire rope sling be taken out of service?
Paragraph (c)(4)(iv) says rope is unusable if visible broken wires within any length of eight diameters exceed 10 percent of the total wires, or if it shows other excessive wear, corrosion or defects.
How often must chain slings get a thorough inspection?
Paragraph (b)(6) says the frequency depends on use, severity of service, the nature of lifts and experience, and may not be more than 12 months apart.
General information only, not legal or safety advice. Employers must follow the current OSHA standard and applicable Pennsylvania rules. Source page checked Nov. 23, 2026.