Guides · Paver patio installation · Step 7

How to compact pavers and fill joints

Compaction seats the pavers in the bed. Joint sand locks them together. Do them in order, with the surface protected and the edges restrained.

Quick answer

Belgard: plate compactor with at least 5,000 lb of force, from the perimeter inward, then again in the opposite direction, at least two passes per paver, then sweep in dry joint sand and vibrate until full. Unilock: at least 3 passes in three directions, no sand on the surface before compacting. Checked Nov. 22, 2026.

Compacting the pavers

Equipment

Belgard: vibratory plate with at least 5,000 lb of compaction force for standard pavers; a roller for slabs larger than 12 x 12 in. Unilock: a rubber roller, or a plate with a polyurethane pad.

Protect the surface

Belgard: cardboard, thin carpet, luan plywood or a urethane mat (p. 8). Unilock: no sand on the surface before compacting.

Pattern

Belgard: perimeter inward in overlapping rows, then again in the opposite direction, at least two passes per paver. Unilock: three directions, minimum 3 passes.

Keep clear of loose edges

Do not compact or fill joints within 3 ft of an unrestrained or incomplete edge, and replace any paver that breaks during compaction (Belgard p. 19).

Filling the joints

Sand choice

Unilock: ASTM C936 semi-coarse sand, polymeric sand the most common choice. Belgard recommends polymeric jointing sand. Neither allows play sand or sandbox sand (Belgard p. 19).

Sweep and vibrate

Belgard: spread dry sand, sweep it into the joints, vibrate, and repeat until full. Re-apply and re-compact after the first settling.

Fill level

Belgard: joint fill should not be more than 1/2 in. below the top (p. 6). Unilock leaves polymeric sand about 1/8 in. below the chamfer. Clean off dust before activating with water; follow the label.

Belgard says to re-inspect and re-sweep the joints two to three weeks after completion (p. 19). Unilock says to fill on a dry day. For sealing, see how long to wait to seal pavers. Before: edge restraints.

Planning figures, not engineering. Polymeric sand brands differ on water, dry time and weather. The bag’s label governs.

Questions

How many passes with the plate compactor on pavers?

Belgard: at least two passes per paver, in opposite directions. Unilock: at least 3 passes in three directions.

What sand goes between pavers?

Unilock: ASTM C936 semi-coarse sand, with polymeric the most common. Belgard recommends polymeric jointing sand and says not to use play sand.

When should I re-sweep the joints?

Belgard says two to three weeks after completion.

Sources: Belgard Technical Resource Guide, pp. 6 to 9, 19; Unilock, How to Build a Patio on Grade. Checked Nov. 22, 2026.

Muthler Landscaping & Construction · Lock Haven, PA

Want it built right?

We build paver patios and walkways in central Pennsylvania, with the base done to the manufacturer’s spec.

Get a quoteAll guides

Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.