Skip to content Groundwork Design Co.Want a design?Custom patio, wall, deck and yard plans, drawn by builders. Anywhere in the U.S. From $349.Start here
LOCK HAVEN, PA · PA HIC #PA212584 · INSURED FREE ESTIMATES · CALL OR TEXT
PAGE

What Is a Joist Hanger?

A joist hanger is a metal connector that holds the end of a joist against the side of a ledger, beam or header so the joist does not have to bear on top of it.

What the deck guide says

The American Wood Council’s deck guide (DCA 6) says each hanger must carry at least 800 pounds, come from an approved manufacturer and be galvanized (p. 7, Figure 7). Inside-flange hangers are used where edge clearance requires it, and clip angles or brackets may not be used in place of a hanger to support joists (p. 7).

What the IRC says

Per the model residential code, approved hangers can replace direct bearing in certain cases, and deck joists that frame into a ledger or beam need approved joist hangers (R502.6.2 and R507.7).

Hangers, fasteners and coatings

A hanger is only as strong as what holds it. DCA 6 requires fasteners that are hot-dipped galvanized, stainless steel, silicon bronze or copper, and nails that meet ASTM F1667 (p. 2). Hardware must be galvanized or stainless, with prefabricated hot-dip hardware coated to G-185 under ASTM A653, and anything within 300 feet of a salt water shoreline must be type 304 or 316 stainless. Because the capacity of a hanger comes from the manufacturer’s data, the right fastener count, length and type come from the product instructions for your lumber, not from a general rule.

Hangers on a ledger

On a house-attached deck, the hangers carry the joists to the ledger, and the ledger carries them to the house, so a perfect hanger cannot rescue a weak ledger connection. DCA 6 requires a ledger at least as large as the joists, and the model code requires a nominal 2×8 minimum (R507.2.1). The guide requires corrosion-resistant flashing at a ledger on a wood-framed wall, with a nominal minimum thickness of 0.019 inch (p. 10). It prohibits attaching a ledger to brick, masonry or stone veneer, and to cantilevered overhangs or bay windows (p. 12). Lag screws are at least ½ inch, installed in a ½-inch hole in the ledger and a 5/16-inch pilot hole in the band board, and are not driven with a hammer. Lead anchors are prohibited, and fastener spacing comes from Table 5, which depends on the joist span and band type (pp. 12 and 13). For wall attachment, the model code says toenails or nails subject to withdrawal are not acceptable (R507.1). Its lateral load connection calls for hold-down devices of at least 1,500 pounds allowable capacity in at least two locations when it follows Figure R507.2.3(1), or 750-pound devices in at least four locations under the alternative detail (R507.2.4).

When hangers are not used

DCA 6 lets joists bear on top of a beam, and that bearing option is allowed only where the deck is attached to the house or detailed per Figure 23. Hangers can attach joists to the side of a beam, but not to opposite sides of the same beam (pp. 5 and 7).

Common mistakes and limits

  • Substituting angle brackets or clip angles for a hanger.
  • Using a hanger without galvanizing or stainless coating, or without manufacturer data showing 800 pounds.
  • Skipping the flashing at the ledger.
  • Relying on toenails or lead anchors where the guide or the model code rules them out.
  • Treating the 800-pound minimum as a design load. It is a floor set by the guide, not a calculation of what your joists need.

Planning information only, not engineering or legal advice. Use the hanger the manufacturer specifies for your lumber and fasteners.

FAQ

Can I use angle brackets instead of joist hangers?

Not under the AWC deck guide, which does not allow clip angles or brackets to support joists.

Do deck joists need hangers?

Under the model IRC, deck joists framing into a ledger or beam need approved hangers. Joists that bear on top of a beam are a different connection.

Sources

Related

Back to the full glossary. Related terms: Joist, Ledger board, Rim joist, Header and Beam.

Planning a deck or addition? Contact Muthler Landscaping & Construction.