Yard problems · Soil and property line
Grass will not grow on fill dirt
You seeded, and got thin, yellow, patchy grass that washes out in the first rain. Fill is often subsoil or mixed material, which may be a poor seedbed. Here is how to check that and what to do about it.
Test the soil, check for compaction, then put real topsoil on top. Penn State Extension calls for a minimum of 4 to 6 inches of good topsoil, firmed or settled depth. Blend about 2 inches into the top of the fill so the layers bond. Add lime and fertilizer only as the soil test says.
What you are seeing
Seed came up in spots, or not at all. Bare areas stay bare.
Blades start green, then pale out and stop growing.
Seed and soil move downhill in rain, leaving rills and bare streaks.
Likely causes, most common first
Fill is often subsoil or mixed material, so its quality varies. Penn State calls for a minimum of 4 to 6 inches of good topsoil for good turf, so a thin skim over fill may not be enough.
Compacted soil can keep water and roots from getting down, so water may sit or run off. Penn State says severe subsoil compaction calls for a ripper, and slight compaction a chisel plow.
Fill can come from anywhere, so its pH and makeup are unknown. A soil test gives a chemical analysis plus lime and fertilizer recommendations. It will not show debris, so dig a few holes and look.
Penn State says late summer is the best seeding time in most of the state. Straw mulch helps hold seed in place, and Penn State says steeper slopes need more.
What to check first
Penn State says to take 8 to 10 random cores, 4 inches deep for lawns, mix them and send the sample to a lab. The report gives a chemical analysis and lime and fertilizer recommendations. For a new lawn, Penn State says to sample three to four weeks before you prep the soil so results are back in time. See our Pennsylvania soil testing guide.
Dig a few holes. Check how deep the topsoil really is and whether you hit hard, tight subsoil right below it. Penn State says compacted subsoil needs to be loosened first (see step 2 below).
Clay, rock or builder debris can change the fix. Look up the mapped soil for your area with the soil by ZIP code tool, then confirm with a shovel.
The fix, step by step
Fix low spots and bad slopes before you spend on topsoil. Penn State says the ground should slope away from buildings at 1 to 4 percent, a 1 to 4 foot drop per 100 feet. It also says the subgrade should be lowered to make room for the topsoil.
Penn State says a ripper can break up severely compacted subsoil, and a chisel plow suits only slight compaction. Once the soil is loosened, keep heavy traffic off it where you can.
Put down a minimum of 4 to 6 inches of good topsoil, measured firmed or settled. Penn State says to blend about 2 inches of it into the upper 2 to 3 inches of subsoil to ease the transition and reduce compaction at the boundary. More on this in topsoil vs fill dirt.
Apply lime only if the soil test shows the soil is too acidic, at the rate the report gives. Penn State says to till phosphorus and potassium in to 4 to 6 inches and not to till in nitrogen. A 1 to 2 inch layer of compost or peat can be worked into the soil.
Penn State says mid to late spring and late summer to early fall are the best seeding windows, with late summer best in most of the state. Rates in pounds per 1,000 square feet: turf-type tall fescue 6 to 8, Kentucky bluegrass 2 to 3, perennial ryegrass 4 to 5, fine fescues 4 to 5. Pick a mix in our Pennsylvania grass seed guide.
Penn State gives 0.5 to 1 pound of nitrogen per 1,000 square feet just before or after seeding. Rates above 1.5 pounds can burn young turf. Straw mulch goes on at 80 to 100 pounds per 1,000 square feet on level or gently sloping ground, with more on steeper slopes.
Seeding is not the end. Penn State calls the 4 to 8 weeks after seeding or sodding critical to survival, so keep the seedbed watered. If the yard slopes and the seed keeps washing out, see hillside erosion after heavy rain. If the ground is also sinking, see backfill settling after utility work.
DIY or call a contractor
- The area is small and already graded right.
- The soil test is back and the problem is nutrients or pH.
- You can till and rake by hand or with a rented tiller.
- The area needs real re-grading or has standing water.
- Compaction needs a ripper or machine work.
- You are moving yards of topsoil, not bags.
- The fill has concrete, rock or debris in it that has to be hauled out.
If you plan to dig deep or regrade, call 811 first. If you suspect the fill is contaminated or full of debris, ask your township or the PA DEP about disposal rules before you move it. This is general information, not legal advice.
Questions
Can I just spread seed on fill dirt?
You can, but it often fails. Fill is often subsoil or mixed material and may be compacted. Penn State Extension says good turf needs a minimum of 4 to 6 inches of good topsoil, firmed or settled depth.
How much topsoil do I need over fill?
Penn State Extension gives a minimum of 4 to 6 inches of good-quality topsoil, measured firmed or settled. It also says to blend about 2 inches of it into the upper 2 to 3 inches of subsoil to ease the transition.
Do I need to till before adding topsoil?
Loosen the surface so the layers bond. Penn State says to till at least 4 inches deep, and that one or two passes with a rototiller is usually enough to mix and loosen soil. Severely compacted subsoil may need a ripper.
When is the best time to seed a new lawn in Pennsylvania?
Penn State says mid to late spring and late summer to early fall are the best seeding windows, with late summer best in most of the state. Seed will not germinate when the soil gets too cold in late fall.
Should I add lime to fill dirt?
Only if a soil test says so. Penn State says to apply lime only when the soil is too acidic, at the rate on the test report.
Sources: Penn State Extension, Lawn Establishment · Penn State Extension, Soil Testing · Penn State AASL soil submission forms. Also see the yard problems hub.
Not sure what is under your lawn?
Send us photos and a short description. We will tell you whether it is a DIY fix or a job that needs equipment.
Call (570) 397-9800Muthler Landscaping & Construction serves Lock Haven, Williamsport, State College, Bellefonte, Lewisburg and Montoursville.
Planning information, not a survey or engineering. Call 811 before you dig. Muthler Landscaping & Construction LLC · 913 Bellefonte Ave, Lock Haven, PA 17745 · (570) 397-9800 · PA HIC #PA212584.